{"id":73,"date":"2023-01-31T23:31:17","date_gmt":"2023-01-31T23:31:17","guid":{"rendered":"https:\/\/www.celec.gob.ec\/celecsur\/?post_type=informacion-tecnica&#038;p=73"},"modified":"2023-01-31T23:51:26","modified_gmt":"2023-01-31T23:51:26","slug":"central-hidroelectrica-paute-mazar","status":"publish","type":"informacion-tecnica","link":"https:\/\/www.celec.gob.ec\/celecsur\/informacion-tecnica\/central-hidroelectrica-paute-mazar\/","title":{"rendered":"Central\u00a0Hidroel\u00e9ctrica\u00a0Paute\u00a0Mazar"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">PRESA\u00a0Y\u00a0T\u00daNELES<\/h2>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td><strong>Tipo <\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>(CFRD) Enrocado con cara de hormig\u00f3n<\/strong><\/td><\/tr><tr><td>Cota de coronaci\u00f3n (con parapeto) <\/td><td class=\"has-text-align-center\" data-align=\"center\">2 166m<\/td><\/tr><tr><td>Longitud coronaci\u00f3n <\/td><td class=\"has-text-align-center\" data-align=\"center\">340 m<\/td><\/tr><tr><td>Altura m\u00e1xima (con parapeto) <\/td><td class=\"has-text-align-center\" data-align=\"center\">166 m desde la cimentaci\u00f3n<\/td><\/tr><tr><td>Volumen de hormig\u00f3n <\/td><td class=\"has-text-align-center\" data-align=\"center\">36.130 m\u00b3<\/td><\/tr><tr><td>Volumen de relleno <\/td><td class=\"has-text-align-center\" data-align=\"center\">5\u2019483.000 m\u00b3<\/td><\/tr><tr><td>Cota Tal\u00f3n <\/td><td class=\"has-text-align-center\" data-align=\"center\">2.000m<\/td><\/tr><tr><td>Cota Lecho (proyecto) <\/td><td class=\"has-text-align-center\" data-align=\"center\">1990m<\/td><\/tr><tr><td>Espesor \u201cCara\u201d <\/td><td class=\"has-text-align-center\" data-align=\"center\">0,77m\/0,30m<\/td><\/tr><tr><td>Espesor Plinto <\/td><td class=\"has-text-align-center\" data-align=\"center\">0,90\/0,50m<\/td><\/tr><tr><td>Ancho \u201cCara\u201d \u2013m\u00e1x.\/min. <\/td><td class=\"has-text-align-center\" data-align=\"center\">303m\/80m<\/td><\/tr><tr><td>Ancho Plinto Izquierdo 1<\/td><td class=\"has-text-align-center\" data-align=\"center\">0,50 m<\/td><\/tr><tr><td>Ancho Plinto Derecho (max\/min) <\/td><td class=\"has-text-align-center\" data-align=\"center\">9,00 m\/7,00m<\/td><\/tr><tr><td>Ancho Base (presa) <\/td><td class=\"has-text-align-center\" data-align=\"center\">500m<\/td><\/tr><tr><td>Inclinaci\u00f3n Taludes <\/td><td class=\"has-text-align-center\" data-align=\"center\">1V: 1,4H<\/td><\/tr><tr><td><\/td><td class=\"has-text-align-center\" data-align=\"center\"><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:31px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">CARACTER\u00cdSTICAS DE LOS VERTEDEROS<\/h2>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td><strong>Tipo <\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>A cielo abierto rectangular\/sin compuertas<\/strong><\/td><\/tr><tr><td>Capacidad m\u00e1xima de descarga <\/td><td class=\"has-text-align-center\" data-align=\"center\">7.500 m3<\/td><\/tr><tr><td>Altura Ca\u00edda <\/td><td class=\"has-text-align-center\" data-align=\"center\">153m<\/td><\/tr><tr><td>Vol. Hormig\u00f3n Conv. <\/td><td class=\"has-text-align-center\" data-align=\"center\">55.870 m3<\/td><\/tr><tr><td>Vol. Excavaci\u00f3n <\/td><td class=\"has-text-align-center\" data-align=\"center\">2\u2019508.000 m3<\/td><\/tr><tr><td>Vol. Excavaci\u00f3n Cuenco <\/td><td class=\"has-text-align-center\" data-align=\"center\">820.000 m3<\/td><\/tr><tr><td>Cota Estructura de Control <\/td><td class=\"has-text-align-center\" data-align=\"center\">2.153 m.s.n.m.<\/td><\/tr><tr><td>Cota Salto de Esqu\u00ed <\/td><td class=\"has-text-align-center\" data-align=\"center\">2.060 m.s.n.m.<\/td><\/tr><tr><td>Cota del Cuenco <\/td><td class=\"has-text-align-center\" data-align=\"center\">2.000 m.s.n.m.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">CARACTER\u00cdSTICAS DE LOS T\u00daNELES DESV\u00cdO<\/h2>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td>Secci\u00f3n ba\u00fal B x H\/longitud <\/td><td class=\"has-text-align-center\" data-align=\"center\">12,70 m x 12 m\/1 202 m<\/td><\/tr><tr><td>Compuertas\/dimensi\u00f3n <\/td><td class=\"has-text-align-center\" data-align=\"center\">2 planas\/5,75 m x 12,0 m<\/td><\/tr><tr><td>Caudal <\/td><td class=\"has-text-align-center\" data-align=\"center\">1.500 m3\/s<\/td><\/tr><tr><td>Periodo Recurrencia <\/td><td class=\"has-text-align-center\" data-align=\"center\">50 a\u00f1os<\/td><\/tr><tr><td>Vol. Hormig\u00f3n Conv. <\/td><td class=\"has-text-align-center\" data-align=\"center\">22.127 m\u00b3<\/td><\/tr><tr><td>Vol. Hormig\u00f3n Lanz. <\/td><td class=\"has-text-align-center\" data-align=\"center\">11.133 m\u00b3<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Desag\u00fce de Fondo<\/h2>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td>Tipo <\/td><td class=\"has-text-align-center\" data-align=\"center\">T\u00fanel con c\u00e1mara de compuertas<\/td><\/tr><tr><td>Secci\u00f3n ba\u00fal (B x H)<\/td><td class=\"has-text-align-center\" data-align=\"center\">6,3 m x 6,15 m<\/td><\/tr><tr><td>Longitud total <\/td><td class=\"has-text-align-center\" data-align=\"center\">376 m<\/td><\/tr><tr><td>Capacidad m\u00e1xima de descarga <\/td><td class=\"has-text-align-center\" data-align=\"center\">450 m3\/s con nivel m\u00e1ximo<\/td><\/tr><tr><td>Cota solera <\/td><td class=\"has-text-align-center\" data-align=\"center\">2.060 m.s.n.m.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">T\u00daNEL DE CARGA<\/h2>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td>Obra de toma <\/td><td class=\"has-text-align-center\" data-align=\"center\">Abocinada el\u00edpticamente<\/td><\/tr><tr><td>Cota solera en la toma <\/td><td class=\"has-text-align-center\" data-align=\"center\">2.083 msnm<\/td><\/tr><tr><td>Cota m\u00e1xima de operaci\u00f3n <\/td><td class=\"has-text-align-center\" data-align=\"center\">2.153 msnm<\/td><\/tr><tr><td>Cota m\u00ednima de operaci\u00f3n <\/td><td class=\"has-text-align-center\" data-align=\"center\">2.098 msnm<\/td><\/tr><tr><td>Secci\u00f3n herradura (BxH) <\/td><td class=\"has-text-align-center\" data-align=\"center\">6,30 m x 6,10 m<\/td><\/tr><tr><td>Longitud <\/td><td class=\"has-text-align-center\" data-align=\"center\">433 m<\/td><\/tr><tr><td>Caudal de dise\u00f1o <\/td><td class=\"has-text-align-center\" data-align=\"center\">141,1 m3\/s<\/td><\/tr><tr><td>Pendiente <\/td><td class=\"has-text-align-center\" data-align=\"center\">0,48% &#8211; 5,8%<\/td><\/tr><tr><td>Revestimiento <\/td><td class=\"has-text-align-center\" data-align=\"center\">Hormig\u00f3n armado<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">TUBER\u00cdA FORZADA<\/h2>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td>Tipo <\/td><td class=\"has-text-align-center\" data-align=\"center\">Pozo vertical, con revestimiento de hormig\u00f3n y parcialmente blindado<\/td><\/tr><tr><td>Cota superior <\/td><td class=\"has-text-align-center\" data-align=\"center\">2.039 msnm<\/td><\/tr><tr><td>Altura de Ca\u00edda <\/td><td class=\"has-text-align-center\" data-align=\"center\">68 m<\/td><\/tr><tr><td>Di\u00e1metro <\/td><td class=\"has-text-align-center\" data-align=\"center\">6,10 m<\/td><\/tr><tr><td>Longitud Tramo Horizontal <\/td><td class=\"has-text-align-center\" data-align=\"center\">25m<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">T\u00daNEL DE EQUILIBRIO INFERIOR<\/h2>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td>Secci\u00f3n (BxH) <\/td><td class=\"has-text-align-center\" data-align=\"center\">8 m x 7,75 m, (utilizando parte del t\u00fanel de construcci\u00f3n)<\/td><\/tr><tr><td>Longitud <\/td><td class=\"has-text-align-center\" data-align=\"center\">366,70 m<\/td><\/tr><tr><td>Pendiente <\/td><td class=\"has-text-align-center\" data-align=\"center\">12,5%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">T\u00daNEL DE DESCARGA<\/h2>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td>Secci\u00f3n herradura (BxH) <\/td><td class=\"has-text-align-center\" data-align=\"center\">8 m x 7,75 m<\/td><\/tr><tr><td>Revestimiento <\/td><td class=\"has-text-align-center\" data-align=\"center\">Hormig\u00f3n<\/td><\/tr><tr><td>Longitud total <\/td><td class=\"has-text-align-center\" data-align=\"center\">732 m<\/td><\/tr><tr><td>Pendiente <\/td><td class=\"has-text-align-center\" data-align=\"center\">0,5%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">POZO DE TRANSPORTE, CABLES Y ASCENSOR<\/h2>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td>Tipo<\/td><td class=\"has-text-align-center\" data-align=\"center\">Vertical, subterr\u00e1neo, revestido de hormig\u00f3n y hormig\u00f3n lanzado.<\/td><\/tr><tr><td>Altura <\/td><td class=\"has-text-align-center\" data-align=\"center\">205 m<\/td><\/tr><tr><td>Di\u00e1metro <\/td><td class=\"has-text-align-center\" data-align=\"center\">10,0 m<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>PRESA\u00a0Y\u00a0T\u00daNELES Tipo (CFRD) Enrocado con cara de hormig\u00f3n Cota de coronaci\u00f3n (con parapeto) 2 166m Longitud coronaci\u00f3n 340 m Altura m\u00e1xima (con parapeto) 166 m desde la cimentaci\u00f3n Volumen de hormig\u00f3n 36.130 m\u00b3 Volumen de relleno 5\u2019483.000 m\u00b3 Cota Tal\u00f3n 2.000m Cota Lecho (proyecto) 1990m Espesor \u201cCara\u201d 0,77m\/0,30m Espesor Plinto 0,90\/0,50m Ancho \u201cCara\u201d \u2013m\u00e1x.\/min. 303m\/80m [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"template":"","meta":{"_acf_changed":false,"_themeisle_gutenberg_block_has_review":false},"class_list":["post-73","informacion-tecnica","type-informacion-tecnica","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/informacion-tecnica\/73","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/informacion-tecnica"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/types\/informacion-tecnica"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/users\/1"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/media?parent=73"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}