{"id":2401,"date":"2024-08-15T11:58:10","date_gmt":"2024-08-15T16:58:10","guid":{"rendered":"https:\/\/www.celec.gob.ec\/celecsur\/?p=2401"},"modified":"2024-08-15T11:58:11","modified_gmt":"2024-08-15T16:58:11","slug":"la-unidad-no-2-de-la-central-manduriacu-esta-en-mantenimiento","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/celecsur\/noticias\/la-unidad-no-2-de-la-central-manduriacu-esta-en-mantenimiento\/","title":{"rendered":"La Unidad No. 2 de la Central Manduriacu est\u00e1 en mantenimiento"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"912\" height=\"687\" src=\"https:\/\/www.celec.gob.ec\/celecsur\/wp-content\/uploads\/2024\/08\/U2-Manduriacu.png\" alt=\"\" class=\"wp-image-2402\" srcset=\"https:\/\/www.celec.gob.ec\/celecsur\/wp-content\/uploads\/2024\/08\/U2-Manduriacu.png 912w, https:\/\/www.celec.gob.ec\/celecsur\/wp-content\/uploads\/2024\/08\/U2-Manduriacu-300x226.png 300w, https:\/\/www.celec.gob.ec\/celecsur\/wp-content\/uploads\/2024\/08\/U2-Manduriacu-768x579.png 768w\" sizes=\"auto, (max-width: 912px) 100vw, 912px\" \/><\/figure>\n\n\n\n<p>Entre el 27 de julio y el 04 de agosto, la Corporaci\u00f3n El\u00e9ctrica del Ecuador \u2013 CELEC EP, a trav\u00e9s de su Unidad de Negocio Coca Codo Sinclair, en cumplimiento del Plan Bianual de Mantenimientos, realizar\u00e1 la intervenci\u00f3n de 8.000 horas en la Unidad No. 2 de la central hidroel\u00e9ctrica Manduriacu, cuya potencia m\u00e1xima instalada es de 65 megavatios. Este mantenimiento se ejecuta considerando este periodo de bajo recurso h\u00eddrico presente en la cuenca del Guayllabamba, que alimenta a la planta.<\/p>\n\n\n\n<p>El alcance de los trabajos contempla intervenir en: generador principal, colector excitatriz, rodete y sistema de control. Estas acciones tienen como objetivo mejorar la operatividad y prolongar la vida \u00fatil de la unidad de generaci\u00f3n.<\/p>\n\n\n\n<p>Adicionalmente, con el apoyo de personal t\u00e9cnico de la Unidad de Negocio Hidroagoy\u00e1n se realizar\u00e1n pruebas el\u00e9ctricas en el generador y escaneo de las paletas del rodete, tipo Kaplan de la Unidad No.2, con la finalidad de determinar la condici\u00f3n operativa de los equipos y planificar acciones a mediano y largo plazo.<\/p>\n\n\n\n<p>Con el cumplimiento de este mantenimiento se garantiza la confiabilidad y disponibilidad de la unidad de generaci\u00f3n, al reducir la probabilidad de fallos y paradas no programadas.<\/p>\n\n\n\n<p>29\/07\/2024<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Entre el 27 de julio y el 04 de agosto, la Corporaci\u00f3n El\u00e9ctrica del Ecuador \u2013 CELEC EP, a trav\u00e9s de su Unidad de Negocio Coca Codo Sinclair, en cumplimiento del Plan Bianual de Mantenimientos, realizar\u00e1 la intervenci\u00f3n de 8.000 horas en la Unidad No. 2 de la central hidroel\u00e9ctrica Manduriacu, cuya potencia m\u00e1xima instalada [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2402,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[7],"tags":[],"class_list":["post-2401","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/posts\/2401","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/comments?post=2401"}],"version-history":[{"count":1,"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/posts\/2401\/revisions"}],"predecessor-version":[{"id":2403,"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/posts\/2401\/revisions\/2403"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/media\/2402"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/media?parent=2401"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/categories?post=2401"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/celecsur\/wp-json\/wp\/v2\/tags?post=2401"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}