{"id":1389,"date":"2024-04-30T16:37:05","date_gmt":"2024-04-30T21:37:05","guid":{"rendered":"https:\/\/www.celec.gob.ec\/cocacodo\/?p=1389"},"modified":"2024-04-30T16:37:15","modified_gmt":"2024-04-30T21:37:15","slug":"unidad-02-de-la-central-hidroelectrica-sopladora-entro-en-operacion","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/cocacodo\/noticias\/unidad-02-de-la-central-hidroelectrica-sopladora-entro-en-operacion\/","title":{"rendered":"Unidad 02 de la Central Hidroel\u00e9ctrica Sopladora entr\u00f3 en operaci\u00f3n"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.celec.gob.ec\/cocacodo\/wp-content\/uploads\/2024\/04\/8.jpg\" alt=\"\" class=\"wp-image-1390\" srcset=\"https:\/\/www.celec.gob.ec\/cocacodo\/wp-content\/uploads\/2024\/04\/8.jpg 1024w, https:\/\/www.celec.gob.ec\/cocacodo\/wp-content\/uploads\/2024\/04\/8-300x225.jpg 300w, https:\/\/www.celec.gob.ec\/cocacodo\/wp-content\/uploads\/2024\/04\/8-768x576.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<p>La Corporaci\u00f3n El\u00e9ctrica del Ecuador, CELEC EP, a trav\u00e9s de la Unidad de Negocio CELEC SUR, declar\u00f3 disponible la Unidad 02 de la central hidroel\u00e9ctrica Sopladora, la tarde de ayer 2 de abril de 2024, una vez que finalizaron el montaje y las pruebas de la reparaci\u00f3n provisional del eje y sello de la turbina, que presentaron una falla en agosto de 2023. De inmediato entr\u00f3 en operaci\u00f3n para cumplir los requerimientos energ\u00e9ticos del Operador Nacional de Electricidad \u2013 CENACE.<\/p>\n\n\n\n<p>Jos\u00e9 Gomezjurado, gerente de CELEC SUR, inform\u00f3 que los t\u00e9cnicos trabajaron en jornadas extendidas para concluir con el montaje y las pruebas del equipamiento. As\u00ed se logr\u00f3 recuperar 130 MW, lo que representa el 80% de su capacidad de generaci\u00f3n. Estas actividades fueron temporales, mientras se fabrica el nuevo eje de la turbina (tipo Francis) para su reemplazo, con lo que se lograr\u00e1 una soluci\u00f3n definitiva y se alcanzar\u00e1 toda su potencia, que es de 162.3 MW.<\/p>\n\n\n\n<p>Al momento, se encuentran disponibles las tres unidades de generaci\u00f3n y su aporte es fundamental para cubrir la demanda de energ\u00eda que requiere el pa\u00eds.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Corporaci\u00f3n El\u00e9ctrica del Ecuador, CELEC EP, a trav\u00e9s de la Unidad de Negocio CELEC SUR, declar\u00f3 disponible la Unidad 02 de la central hidroel\u00e9ctrica Sopladora, la tarde de ayer 2 de abril de 2024, una vez que finalizaron el montaje y las pruebas de la reparaci\u00f3n provisional del eje y sello de la turbina, [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":1390,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[8],"tags":[],"class_list":["post-1389","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/posts\/1389","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/comments?post=1389"}],"version-history":[{"count":1,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/posts\/1389\/revisions"}],"predecessor-version":[{"id":1391,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/posts\/1389\/revisions\/1391"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/media\/1390"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/media?parent=1389"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/categories?post=1389"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/tags?post=1389"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}