{"id":527,"date":"2021-09-03T20:20:02","date_gmt":"2021-09-04T01:20:02","guid":{"rendered":"https:\/\/www.celec.gob.ec\/cocacodo\/?p=697"},"modified":"2021-09-03T20:20:02","modified_gmt":"2021-09-04T01:20:02","slug":"se-inicia-el-mantenimiento-semestral-de-la-unidad-1-de-la-central-hidroelectrica-manduriacu","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/cocacodo\/noticias\/se-inicia-el-mantenimiento-semestral-de-la-unidad-1-de-la-central-hidroelectrica-manduriacu\/","title":{"rendered":"BOLET\u00cdN DE NOTICIAS"},"content":{"rendered":"<p class=\"MsoNormal\" style=\"line-height: normal; text-align: center;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\"><b style=\"font-family: Tahoma, Helvetica, Arial, sans-serif; font-size: 12.16px;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">Se inicia el mantenimiento semestral de la Unidad 1 de la central hidroel\u00e9ctrica Manduriacu<\/span><\/b> <\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\"><span style=\"font-size: 9pt;\">CELEC EP, a trav\u00e9s de su Unidad de Negocio Coca Codo Sinclair, inicia la intervenci\u00f3n semestral de la unidad No. 1 de la central hidroel\u00e9ctrica Manduriacu, que posee una capacidad m\u00e1xima instalada de 65 megavatios de potencia. Los trabajos iniciaron el d\u00eda de ayer, 02 de septiembre, con la parada de la unidad, en coordinaci\u00f3n con el Operador Nacional de Energ\u00eda, CENACE.<\/span><\/span><\/p>\n<p><!--more--><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">El d\u00eda de hoy, t\u00e9cnicos de la Unidad de Negocio Coca Codo Sinclair iniciaron la intervenci\u00f3n de los equipos principales y auxiliares de la unidad de generaci\u00f3n No.1, trabajos que durar\u00e1n 10 d\u00edas y en los cuales se realizar\u00e1n labores principalmente en: colector de exitatriz, rotor y estator y, a nivel mec\u00e1nico y civil se trabajar\u00e1 en las unidades oleohidr\u00e1ulicas y distribuidor.<\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">Esta actividad se ejecuta aprvechando los bajos caudales presentes en la cuenca del r\u00edo Guyallabamba, agua que alimenta a la central; con la finalidad de mejorar su eficiencia y operatividad para la termporada de invierno, que opera a su m\u00e1xima capacidad.<\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">La unidad No. 2 contin\u00faa generando energ\u00eda y entrega 32.5 megavatios de potencia al Sistema Nacional Interconectado.<\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">La central Manduriacu abastece la demanda energ\u00e9tica a la parte noroccidental del pa\u00eds, por su cercan\u00eda a esta zona.<\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">Una vez concluidos los trabajos de mantenimiento se garantizara la disponibilidad de los equipos intervenidos as\u00ed como el suministro de energ\u00eda el\u00e9ctrica.<\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">M\u00e1s informaci\u00f3n: <\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">Bel\u00e9n Cadena M\u00e9ndez <br \/>Comunicaci\u00f3n \u2013 UN Coca Codo Sinclair <br \/>Celular: 099 508 9693 <br \/>Correo: belen.cadena@celec.gob.ec <\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Se inicia el mantenimiento semestral de la Unidad 1 de la central hidroel\u00e9ctrica Manduriacu CELEC EP, a trav\u00e9s de su Unidad de Negocio Coca Codo Sinclair, inicia la intervenci\u00f3n semestral de la unidad No. 1 de la central hidroel\u00e9ctrica Manduriacu, que posee una capacidad m\u00e1xima instalada de 65 megavatios de potencia. Los trabajos iniciaron el [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[8],"tags":[],"class_list":["post-527","post","type-post","status-publish","format-standard","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/posts\/527","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/comments?post=527"}],"version-history":[{"count":0,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/posts\/527\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/media?parent=527"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/categories?post=527"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/tags?post=527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}