{"id":547,"date":"2021-04-26T02:28:42","date_gmt":"2021-04-26T07:28:42","guid":{"rendered":"https:\/\/www.celec.gob.ec\/cocacodo\/?p=669"},"modified":"2021-04-26T02:28:42","modified_gmt":"2021-04-26T07:28:42","slug":"ministro-rene-ortiz-verifico-trabajos-en-el-rio-coca-e-inspecciono-el-funcionamiento-de-la-central-coca-codo-sinclair","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/cocacodo\/noticias\/ministro-rene-ortiz-verifico-trabajos-en-el-rio-coca-e-inspecciono-el-funcionamiento-de-la-central-coca-codo-sinclair\/","title":{"rendered":"BOLET\u00cdN DE NOTICIAS"},"content":{"rendered":"<p class=\"MsoNormal\" style=\"line-height: normal; text-align: center;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\"><b style=\"font-family: Tahoma, Helvetica, Arial, sans-serif; font-size: 12.16px;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">Ministro Ren\u00e9 Ortiz verific\u00f3 trabajos en el r\u00edo Coca e inspeccion\u00f3 el funcionamiento de la central Coca Codo Sinclair<\/span><\/b> <\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\"><span style=\"font-size: 9pt;\">El ministro de Energ\u00eda y Recursos Naturales No Renovables, Ren\u00e9 Ortiz, y las autoridades del sector el\u00e9ctrico inspeccionaron las obras temporales desarrolladas por la Corporaci\u00f3n El\u00e9ctrica del Ecuador (CELEC EP) para enfrentar la erosi\u00f3n regresiva en el r\u00edo Coca y proteger las obras de captaci\u00f3n de la central hidroel\u00e9ctrica Coca Codo Sinclair. Tambi\u00e9n revisaron los estudios definitivos para la construcci\u00f3n de la segunda instancia de estructuras y precautelar la captaci\u00f3n de la principal hidroel\u00e9ctrica del pa\u00eds.<\/span><\/span><\/p>\n<p><!--more--><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">Tras un recorrido por el sistema de obras que conforman la captaci\u00f3n, ubicada a 10.5 km del frente de erosi\u00f3n regresiva del r\u00edo Coca, las autoridades llegaron al sitio donde se construir\u00e1n las pantallas r\u00edgidas para mitigar la erosi\u00f3n regresiva. Estas se ubicar\u00e1n 1.2 km aguas abajo de las obras de captaci\u00f3n.<\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">El director de la Comisi\u00f3n Ejecutora R\u00edo Coca, Alberto Zambrano, explic\u00f3 los trabajos realizados por CELEC EP en la cuenca del r\u00edo, entre los que constan las emergentes, con diques de enrocado y de contenedores met\u00e1licos rellenos de hormig\u00f3n para ralentizar el proceso de erosi\u00f3n regresiva.<\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">Luego de varias investigaciones cient\u00edficas contratadas por CELEC EP, se opt\u00f3 por la alternativa de construir 14 pantallas subterr\u00e1neas. Estas se edificar\u00e1n con la t\u00e9cnica de inyecci\u00f3n de hormig\u00f3n a presi\u00f3n (jet grouting) para consolidar el material; las obras se desarrollar\u00e1n durante el periodo de estiaje, cuando disminuyen los caudales del r\u00edo. Su funci\u00f3n ser\u00e1 disminuir la velocidad del flujo y la energ\u00eda erosiva del r\u00edo Coca.<\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">Las autoridades tambi\u00e9n llegaron hasta el frente de erosi\u00f3n y el puente de ingreso a la Ventana 2 para revisar el funcionamiento del sistema de diques en el cauce, que fueron construidos durante el estiaje (entre octubre y marzo).<\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\"><strong>Recorrido por la central Coca Codo Sinclair<\/strong> <\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">Las autoridades del sector el\u00e9ctrico recorrieron la casa de m\u00e1quinas de la Central Coca Codo Sinclair, con una capacidad de 1 500 MW, que el jueves 22 de abril gener\u00f3 1 300 MW\/h para el Sistema Nacional Interconectado, cumpliendo los requerimientos del Operador Nacional de Electricidad (Operador CENACE).<\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">Las autoridades ingresaron a la Unidad de Generaci\u00f3n Nro. 6, que est\u00e1 fuera de operaci\u00f3n por mantenimiento programado, en coordinaci\u00f3n con el Operador CENACE. Posteriormente llegaron hasta la caverna de transformadores y subestaci\u00f3n GIS, que recibe la energ\u00eda de las unidades de generaci\u00f3n y entrega a la subestaci\u00f3n San Rafael, que es parte del sistema de transmisi\u00f3n a 500 kV, que lleva la energ\u00eda a varias provincias del pa\u00eds.<\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\">USD 5.5 millones para gesti\u00f3n social<\/span><\/p>\n<p class=\"MsoNormal\" style=\"mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; text-align: justify; text-justify: inter-ideograph; line-height: 10.5pt;\"><span lang=\"ES\" style=\"font-size: 9pt; font-family: Tahoma, sans-serif;\"> \u201cFue una inspecci\u00f3n de los trabajos de mitigaci\u00f3n para detener la erosi\u00f3n regresiva del r\u00edo Coca ejecutados por CELEC y conocer de primera mano los dise\u00f1os que permitir\u00e1n precautelar las obras de captaci\u00f3n a largo plazo. Adem\u00e1s, me permiti\u00f3 verificar el estado actual de recepci\u00f3n de la Central Coca Codo Sinclair, que tiene un avance de 81% y concluir\u00e1 a finales del 2022\u201d, concluy\u00f3 el Ministro de Energ\u00eda, Ren\u00e9 Ortiz.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ministro Ren\u00e9 Ortiz verific\u00f3 trabajos en el r\u00edo Coca e inspeccion\u00f3 el funcionamiento de la central Coca Codo Sinclair El ministro de Energ\u00eda y Recursos Naturales No Renovables, Ren\u00e9 Ortiz, y las autoridades del sector el\u00e9ctrico inspeccionaron las obras temporales desarrolladas por la Corporaci\u00f3n El\u00e9ctrica del Ecuador (CELEC EP) para enfrentar la erosi\u00f3n regresiva en [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[8],"tags":[],"class_list":["post-547","post","type-post","status-publish","format-standard","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/posts\/547","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/comments?post=547"}],"version-history":[{"count":0,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/posts\/547\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/media?parent=547"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/categories?post=547"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/cocacodo\/wp-json\/wp\/v2\/tags?post=547"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}