{"id":2394,"date":"2023-10-24T15:45:18","date_gmt":"2023-10-24T15:45:18","guid":{"rendered":"https:\/\/www.celec.gob.ec\/electroguayas\/?p=2394"},"modified":"2023-10-31T15:52:33","modified_gmt":"2023-10-31T15:52:33","slug":"la-rehabilitacion-de-la-central-termica-esmeraldas-i-registra-avance-del-90-24-octubre-2023","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/electroguayas\/noticias\/la-rehabilitacion-de-la-central-termica-esmeraldas-i-registra-avance-del-90-24-octubre-2023\/","title":{"rendered":"La rehabilitaci\u00f3n de la Central T\u00e9rmica Esmeraldas I registra avance del 90% | \u00a024-octubre-2023"},"content":{"rendered":"<figure class=\"aligncenter wp-block-post-featured-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"726\" height=\"412\" src=\"https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2023\/10\/Avances-rehabilitacion-Termoesmeraldas-I.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"object-fit:cover;\" srcset=\"https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2023\/10\/Avances-rehabilitacion-Termoesmeraldas-I.jpg 726w, https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2023\/10\/Avances-rehabilitacion-Termoesmeraldas-I-300x170.jpg 300w\" sizes=\"(max-width: 726px) 100vw, 726px\" \/><\/figure>\n\n\n<p>La recuperaci\u00f3n de la central t\u00e9rmica Esmeraldas I de 125 megavatios (MW), operada por la Unidad Operativa Termoesmeraldas, avanza conforme el cronograma establecido. Durante el \u00faltimo fin de semana se instal\u00f3 el rotor del generador, con lo que alcanz\u00f3 un avance del 90%.<\/p>\n\n\n\n<p>Para concluir los trabajos se estableci\u00f3 un cronograma regresivo de actividades, entre el 23 y 28 de octubre, cuando se inician las maniobras de arranque de la central. Entre las actividades que se desarrollan est\u00e1n: mantenimiento de tuber\u00edas del sistema de hidr\u00f3geno, regulaci\u00f3n de tuber\u00edas de sistemas auxiliares, pruebas el\u00e9ctricas del generador, pruebas de excitatriz y protecci\u00f3n el\u00e9ctrica.<\/p>\n\n\n\n<p>Entre el domingo 29 y el lunes 30 de octubre se realizar\u00e1n los ajustes finales para declarar la disponibilidad de esta central a partir del martes 31 del presente mes. El aporte de los 125 MW es de significativa importancia para contribuir a cubrir la demanda nacional de electricidad, sobre todo en \u00e9poca de estiaje.<\/p>\n\n\n\n<p>Para cumplir con este cronograma los t\u00e9cnicos, en sus diferentes \u00e1reas, intensificaron sus labores. Alrededor de un centenar de t\u00e9cnicos cumplen hasta 14 horas diarias, a fin de declarar la disponibilidad de la central antes del tiempo previsto.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La recuperaci\u00f3n de la central t\u00e9rmica Esmeraldas I de 125 megavatios (MW), operada por la Unidad Operativa Termoesmeraldas, avanza conforme el cronograma establecido. Durante el \u00faltimo fin de semana se instal\u00f3 el rotor del generador, con lo que alcanz\u00f3 un avance del 90%. Para concluir los trabajos se estableci\u00f3 un cronograma regresivo de actividades, entre [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":2395,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-2394","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/2394","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/comments?post=2394"}],"version-history":[{"count":1,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/2394\/revisions"}],"predecessor-version":[{"id":2396,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/2394\/revisions\/2396"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/media\/2395"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/media?parent=2394"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/categories?post=2394"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/tags?post=2394"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}