{"id":2930,"date":"2023-12-29T14:49:00","date_gmt":"2023-12-29T14:49:00","guid":{"rendered":"https:\/\/www.celec.gob.ec\/electroguayas\/?p=2930"},"modified":"2024-01-17T14:55:03","modified_gmt":"2024-01-17T14:55:03","slug":"celec-ep-hidronacion-invirtio-usd-48-960-en-acciones-de-prevencion-para-el-fenomeno-de-el-nino-29-diciembre-2023","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/electroguayas\/noticias\/celec-ep-hidronacion-invirtio-usd-48-960-en-acciones-de-prevencion-para-el-fenomeno-de-el-nino-29-diciembre-2023\/","title":{"rendered":"CELEC EP Hidronaci\u00f3n invirti\u00f3 USD 48.960 en acciones de prevenci\u00f3n para el fen\u00f3meno de El Ni\u00f1o | \u00a029-diciembre-2023"},"content":{"rendered":"<figure class=\"wp-block-post-featured-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"619\" height=\"466\" src=\"https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2024\/01\/Hidronacion-fenomeno.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"object-fit:cover;\" srcset=\"https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2024\/01\/Hidronacion-fenomeno.jpg 619w, https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2024\/01\/Hidronacion-fenomeno-300x226.jpg 300w\" sizes=\"(max-width: 619px) 100vw, 619px\" \/><\/figure>\n\n\n<p>La Unidad de Negocio Hidronaci\u00f3n, perteneciente a la Corporaci\u00f3n El\u00e9ctrica del Ecuador (CELEC EP), desarroll\u00f3 varias actividades de preparaci\u00f3n y prevenci\u00f3n para el temporal invernal y Fen\u00f3meno El Ni\u00f1o (ENOS).<\/p>\n\n\n\n<p>A trav\u00e9s del departamento de Responsabilidad Social se realizaron trabajos de reconformaci\u00f3n de 35 km, de v\u00edas de acceso a comunidades, ubicadas dentro de la zona de influencia de la central hidroel\u00e9ctrica Marcel Laniado De Wind, de 213 megavatios.<\/p>\n\n\n\n<p>Adicional, se realizaron limpieza de canales de desag\u00fce en la comunidad de Carlos Julio Arosemena, reconformaci\u00f3n de puertos fluviales del embalse Daule Peripa, excavaciones e instalaci\u00f3n de tuber\u00edas para mejorar el drenaje v\u00eda topadero \u2013 R\u00edo Daule, y reconformaci\u00f3n de v\u00edas internas en diferentes puntos.<\/p>\n\n\n\n<p>Estas acciones han beneficiado a 12.700 habitantes de las comunidades de Carlos Julio Arosemena, Pedro Velez, Topadero, Campo Verde, Las Piedras, San Isidro, La Uni\u00f3n, La Rita, Barraganete.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Unidad de Negocio Hidronaci\u00f3n, perteneciente a la Corporaci\u00f3n El\u00e9ctrica del Ecuador (CELEC EP), desarroll\u00f3 varias actividades de preparaci\u00f3n y prevenci\u00f3n para el temporal invernal y Fen\u00f3meno El Ni\u00f1o (ENOS). A trav\u00e9s del departamento de Responsabilidad Social se realizaron trabajos de reconformaci\u00f3n de 35 km, de v\u00edas de acceso a comunidades, ubicadas dentro de la [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":2931,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-2930","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/2930","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/comments?post=2930"}],"version-history":[{"count":1,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/2930\/revisions"}],"predecessor-version":[{"id":2932,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/2930\/revisions\/2932"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/media\/2931"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/media?parent=2930"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/categories?post=2930"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/tags?post=2930"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}