{"id":2947,"date":"2024-01-15T15:45:21","date_gmt":"2024-01-15T15:45:21","guid":{"rendered":"https:\/\/www.celec.gob.ec\/electroguayas\/?p=2947"},"modified":"2024-01-17T15:47:08","modified_gmt":"2024-01-17T15:47:08","slug":"en-el-2023-la-central-hidroelectrica-baba-logro-nuevo-record-de-produccion-electrica-15-enero-2024","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/electroguayas\/noticias\/en-el-2023-la-central-hidroelectrica-baba-logro-nuevo-record-de-produccion-electrica-15-enero-2024\/","title":{"rendered":"En el 2023, la Central Hidroel\u00e9ctrica Baba logr\u00f3 nuevo \u00a0r\u00e9cord de producci\u00f3n el\u00e9ctrica | \u00a015-enero-2024"},"content":{"rendered":"<figure class=\"aligncenter wp-block-post-featured-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"542\" height=\"552\" src=\"https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2024\/01\/Baba.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"object-fit:cover;\" srcset=\"https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2024\/01\/Baba.jpg 542w, https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2024\/01\/Baba-295x300.jpg 295w\" sizes=\"(max-width: 542px) 100vw, 542px\" \/><\/figure>\n\n\n<p>Durante 2023, la Central Baba, administrada por la Unidad de Negocio Hidronaci\u00f3n de la Corporaci\u00f3n El\u00e9ctrica del Ecuador (CELEC EP), alcanz\u00f3 nuevos niveles m\u00e1ximos de generaci\u00f3n el\u00e9ctrica. En el a\u00f1o que concluy\u00f3, con sus dos unidades de generaci\u00f3n, entreg\u00f3 186,36 gigavatios de energ\u00eda neta al Sistema Nacional Interconectado (SNI). Antes de 2022, la generaci\u00f3n m\u00e1xima hist\u00f3rica, fue de 150,30 GWh, es decir en el 2023 se podujeron 36,6 GWh adicionales.<\/p>\n\n\n\n<p>La Central Baba, ubicada en el km 39 v\u00eda Quevedo Santo Domingo de los Ts\u00e1chilas, en el cant\u00f3n Buena Fe, provincia de Los R\u00edos, realiz\u00f3 la contribuci\u00f3n energ\u00e9tica m\u00e1s alta en los diez a\u00f1os de funcionamiento de esta central.<\/p>\n\n\n\n<p>Este logro es el resultado de un eficiente manejo t\u00e9cnico de los programas de mantenimiento preventivo, predictivo y correctivo, ejecutados por profesionales especializados de CELEC EP Hidronaci\u00f3n, las cuales permiten garantizar altos niveles de disponibilidad y confiabilidad de la Central Hidroel\u00e9ctrica.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Durante 2023, la Central Baba, administrada por la Unidad de Negocio Hidronaci\u00f3n de la Corporaci\u00f3n El\u00e9ctrica del Ecuador (CELEC EP), alcanz\u00f3 nuevos niveles m\u00e1ximos de generaci\u00f3n el\u00e9ctrica. En el a\u00f1o que concluy\u00f3, con sus dos unidades de generaci\u00f3n, entreg\u00f3 186,36 gigavatios de energ\u00eda neta al Sistema Nacional Interconectado (SNI). Antes de 2022, la generaci\u00f3n m\u00e1xima [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":2948,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-2947","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/2947","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/comments?post=2947"}],"version-history":[{"count":1,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/2947\/revisions"}],"predecessor-version":[{"id":2949,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/2947\/revisions\/2949"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/media\/2948"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/media?parent=2947"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/categories?post=2947"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/tags?post=2947"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}