{"id":3198,"date":"2024-04-08T16:51:19","date_gmt":"2024-04-08T16:51:19","guid":{"rendered":"https:\/\/www.celec.gob.ec\/electroguayas\/?p=3198"},"modified":"2024-04-22T16:55:40","modified_gmt":"2024-04-22T16:55:40","slug":"termogas-machala-recupero-20mw-de-la-unidad-tm-2-8-abril-2024","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/electroguayas\/noticias\/termogas-machala-recupero-20mw-de-la-unidad-tm-2-8-abril-2024\/","title":{"rendered":"Termogas Machala recuper\u00f3 20MW de la Unidad TM-2 | \u00a08-abril-2024"},"content":{"rendered":"<figure class=\"wp-block-post-featured-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"518\" height=\"530\" src=\"https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2024\/04\/U-TGM.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"object-fit:cover;\" srcset=\"https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2024\/04\/U-TGM.jpg 518w, https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2024\/04\/U-TGM-293x300.jpg 293w\" sizes=\"(max-width: 518px) 100vw, 518px\" \/><\/figure>\n\n\n<p>La Unidad de Negocio Termogas Machala concluy\u00f3 el mantenimiento de la Unidad TM-2, de 20MW, y desde las 17h00 del domingo 07 de abril, se incorpor\u00f3 al Sistema Nacional Interconectado (SIN). Esta central tiene una capacidad instalada de 230 MW y al momento entrega 94MW, desde las unidades 6FA1, TM2, TM3 y TM4.<\/p>\n\n\n\n<p>Los trabajos de mantenimiento se desarrollaron del 1 al 7 de abril de 2024. En este per\u00edodo se repararon fisuras en la campana de la turbina, ubicadas en la secci\u00f3n de escape de gases, adem\u00e1s, se instalaron planchas met\u00e1licas para corregir perforaciones y prevenir la fuga de gases. De esa forma se protegieron los instrumentos ante posibles da\u00f1os por la temperatura. Tambi\u00e9n, se pint\u00f3 la cabina de la turbina, con lo que se mejor\u00f3 su protecci\u00f3n.<\/p>\n\n\n\n<p>Estas actividades son parte de la planificaci\u00f3n del mantenimiento semestral exhaustivo que se realiza a todos los componentes de la unidad de generaci\u00f3n: m\u00f3dulos de control y fuerza, motores, bombas, precipitador electrost\u00e1tico, entre otros.<\/p>\n\n\n\n<p>De esa forma se garantiza el \u00f3ptimo rendimiento y la seguridad operativa del parque de generaci\u00f3n Termogas Machala, ubicado en el Km. 1,5 v\u00eda a Bajo Alto, El Guabo, provincia de El Oro.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Unidad de Negocio Termogas Machala concluy\u00f3 el mantenimiento de la Unidad TM-2, de 20MW, y desde las 17h00 del domingo 07 de abril, se incorpor\u00f3 al Sistema Nacional Interconectado (SIN). Esta central tiene una capacidad instalada de 230 MW y al momento entrega 94MW, desde las unidades 6FA1, TM2, TM3 y TM4. Los trabajos [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":3199,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-3198","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/3198","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/comments?post=3198"}],"version-history":[{"count":1,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/3198\/revisions"}],"predecessor-version":[{"id":3200,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/3198\/revisions\/3200"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/media\/3199"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/media?parent=3198"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/categories?post=3198"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/tags?post=3198"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}