{"id":3372,"date":"2024-07-31T23:51:00","date_gmt":"2024-07-31T23:51:00","guid":{"rendered":"https:\/\/www.celec.gob.ec\/electroguayas\/?p=3372"},"modified":"2024-08-08T23:55:29","modified_gmt":"2024-08-08T23:55:29","slug":"se-modernizan-sistemas-de-regulacion-de-la-central-hidroelectrica-baba-31-julio-2024","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/electroguayas\/noticias\/se-modernizan-sistemas-de-regulacion-de-la-central-hidroelectrica-baba-31-julio-2024\/","title":{"rendered":"Se modernizan sistemas de regulaci\u00f3n de la Central Hidroel\u00e9ctrica Baba |\u00a031-julio-2024"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"768\" height=\"575\" src=\"https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2024\/08\/Boletin-Hidronacion.png\" alt=\"\" class=\"wp-image-3373\" srcset=\"https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2024\/08\/Boletin-Hidronacion.png 768w, https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2024\/08\/Boletin-Hidronacion-300x225.png 300w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<p>La Corporaci\u00f3n El\u00e9ctrica del Ecuador (CELEC EP), a trav\u00e9s de la Unidad de Negocio Hidronaci\u00f3n, instala equipos modernos para mantener y mejorar la confiabilidad del sistema de regulaci\u00f3n de tensi\u00f3n de la central hidroel\u00e9ctrica Baba, de 42 MW (megavatios).<\/p>\n\n\n\n<p>Estos trabajos consisten en la implementaci\u00f3n de equipamiento de \u00faltima tecnolog\u00eda. Para ello se trabaja en el desmontaje de los equipos que ser\u00e1n sustituidos por nuevos equipos, adecuaci\u00f3n de las instalaciones el\u00e9ctricas, instalaci\u00f3n de nueva interfaz hombre m\u00e1quina (HMI), realizaci\u00f3n de pruebas punto a punto, verificaciones iniciales y pruebas de puesta en marcha. El objetivo es mejorar la vida \u00fatil y ganar mayor robustez en sistema de regulaci\u00f3n de tensi\u00f3n.<\/p>\n\n\n\n<p>Estos trabajos est\u00e1n a cargo de personal t\u00e9cnico calificado de la Unidad de Negocio y el proveedor. La central hidroel\u00e9ctrica Baba mantiene altos \u00edndices de confiabilidad y disponibilidad entregando energ\u00eda limpia para todos los ecuatorianos<em>,<\/em>&nbsp;manifest\u00f3 el m\u00e1ster Miguel Rodr\u00edguez, jefe de central.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Corporaci\u00f3n El\u00e9ctrica del Ecuador (CELEC EP), a trav\u00e9s de la Unidad de Negocio Hidronaci\u00f3n, instala equipos modernos para mantener y mejorar la confiabilidad del sistema de regulaci\u00f3n de tensi\u00f3n de la central hidroel\u00e9ctrica Baba, de 42 MW (megavatios). Estos trabajos consisten en la implementaci\u00f3n de equipamiento de \u00faltima tecnolog\u00eda. Para ello se trabaja en [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":3373,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-3372","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/3372","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/comments?post=3372"}],"version-history":[{"count":1,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/3372\/revisions"}],"predecessor-version":[{"id":3374,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/3372\/revisions\/3374"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/media\/3373"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/media?parent=3372"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/categories?post=3372"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/tags?post=3372"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}