{"id":4112,"date":"2025-08-11T16:31:36","date_gmt":"2025-08-11T16:31:36","guid":{"rendered":"https:\/\/www.celec.gob.ec\/electroguayas\/?p=4112"},"modified":"2025-08-15T16:34:04","modified_gmt":"2025-08-15T16:34:04","slug":"concluyo-el-mantenimiento-anual-preventivo-de-la-central-sarapullo-11-de-agosto-de-2025","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/electroguayas\/noticias\/concluyo-el-mantenimiento-anual-preventivo-de-la-central-sarapullo-11-de-agosto-de-2025\/","title":{"rendered":"Concluy\u00f3 el mantenimiento anual preventivo de la central Sarapullo | \u00a011 de\u00a0agosto de\u00a02025"},"content":{"rendered":"<figure class=\"wp-block-post-featured-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"766\" src=\"https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2025\/08\/image-2-1024x766-1.png\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"object-fit:cover;\" srcset=\"https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2025\/08\/image-2-1024x766-1.png 1024w, https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2025\/08\/image-2-1024x766-1-300x224.png 300w, https:\/\/www.celec.gob.ec\/electroguayas\/wp-content\/uploads\/2025\/08\/image-2-1024x766-1-768x575.png 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n<p>El Gobierno Nacional, a trav\u00e9s de la Corporaci\u00f3n El\u00e9ctrica del Ecuador \u2013CELEC EP\u2013, concluy\u00f3 el mantenimiento programado preventivo anual de la captaci\u00f3n Pilat\u00f3n y de las tres unidades de generaci\u00f3n de la Central Hidroel\u00e9ctrica Sarapullo, de 49 megavatios. Los trabajos, realizados del 10 de julio al 8 de agosto, tuvieron como objetivo asegurar el funcionamiento de la central y garantizar la producci\u00f3n de energ\u00eda para el pa\u00eds.<\/p>\n\n\n\n<p>Se intervinieron en diferentes sistemas y equipos, entre ellos: generadores, turbinas, celdas de media tensi\u00f3n, sistemas auxiliares el\u00e9ctricos y mec\u00e1nicos, entre otros. Adem\u00e1s, se realiz\u00f3 el dragado del embalse en captaci\u00f3n Pilat\u00f3n, con lo que se optimiza la operaci\u00f3n de la central.<\/p>\n\n\n\n<p>Este mantenimiento refuerza el compromiso del gobierno del Nuevo Ecuador con una gesti\u00f3n energ\u00e9tica t\u00e9cnica y eficiente para garantizar la operatividad y la sostenibilidad el\u00e9ctrica del pa\u00eds.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>El Gobierno Nacional, a trav\u00e9s de la Corporaci\u00f3n El\u00e9ctrica del Ecuador \u2013CELEC EP\u2013, concluy\u00f3 el mantenimiento programado preventivo anual de la captaci\u00f3n Pilat\u00f3n y de las tres unidades de generaci\u00f3n de la Central Hidroel\u00e9ctrica Sarapullo, de 49 megavatios. Los trabajos, realizados del 10 de julio al 8 de agosto, tuvieron como objetivo asegurar el funcionamiento [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":4113,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"yes","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-4112","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/4112","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/comments?post=4112"}],"version-history":[{"count":1,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/4112\/revisions"}],"predecessor-version":[{"id":4114,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/4112\/revisions\/4114"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/media\/4113"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/media?parent=4112"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/categories?post=4112"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/tags?post=4112"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}