{"id":4639,"date":"2026-04-10T15:34:21","date_gmt":"2026-04-10T15:34:21","guid":{"rendered":"https:\/\/www.celec.gob.ec\/electroguayas\/?p=4639"},"modified":"2026-05-04T15:47:01","modified_gmt":"2026-05-04T15:47:01","slug":"concluyo-la-construccion-del-dique-permeable-obra-que-protege-la-captacion-de-agua-de-la-central-hidroelectrica-coca-codo-sinclair-10-abril-2026","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/electroguayas\/noticias\/concluyo-la-construccion-del-dique-permeable-obra-que-protege-la-captacion-de-agua-de-la-central-hidroelectrica-coca-codo-sinclair-10-abril-2026\/","title":{"rendered":"Concluy\u00f3 la construcci\u00f3n del dique permeable, obra que protege la captaci\u00f3n de agua de la central hidroel\u00e9ctrica Coca Codo Sinclair | \u00a010-abril-2026"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.celec.gob.ec\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-10-at-12.32.52-1024x566.jpeg\" alt=\"\" class=\"wp-image-9106\"\/><\/figure>\n\n\n\n<p>El Gobierno Nacional, a trav\u00e9s de la Corporaci\u00f3n El\u00e9ctrica del Ecuador (CELEC EP), concluy\u00f3 la construcci\u00f3n del dique permeable en el r\u00edo Coca, una obra clave para enfrentar la erosi\u00f3n regresiva y proteger la captaci\u00f3n de agua de la Central Hidroel\u00e9ctrica Coca Codo Sinclair de 1.500 megavatios (MW) de potencia, localizada entre las provincias de Napo y Sucumb\u00edos.<\/p>\n\n\n\n<p>La infraestructura, que demand\u00f3 una inversi\u00f3n de USD 19 millones, forma parte de la respuesta t\u00e9cnica ejecutada por el Estado ecuatoriano frente a este fen\u00f3meno natural, \u00fanico en el mundo, inform\u00f3 la ministra de Ambiente y Energ\u00eda (MAE), In\u00e9s Manzano, en Teleamazonas. Su construcci\u00f3n tuvo la asesor\u00eda del Cuerpo de Ingenieros del Ej\u00e9rcito de Estados Unidos (USACE).<\/p>\n\n\n\n<p>Con esta obra, ubicada a 7,8 km aguas abajo de la captaci\u00f3n de la principal central de generaci\u00f3n hidroel\u00e9ctrica que tiene el pa\u00eds, se ampl\u00eda el ancho del r\u00edo de 80 a 200 metros, lo que permite reducir el poder erosivo del afluente. El dique permeable est\u00e1 reforzado con rocas de gran tama\u00f1o, lo que permite el paso del agua y el sedimento, pero impide que el r\u00edo siga profundiz\u00e1ndose.<\/p>\n\n\n\n<p>Con estas acciones, el Gobierno de El Nuevo Ecuador, a trav\u00e9s del MAE y de la CELEC EP, preservan la infraestructura estrat\u00e9gica de generaci\u00f3n el\u00e9ctrica, con la finalidad de garantizar un servicio el\u00e9ctrico seguro y eficiente para los ecuatorianos.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>El Gobierno Nacional, a trav\u00e9s de la Corporaci\u00f3n El\u00e9ctrica del Ecuador (CELEC EP), concluy\u00f3 la construcci\u00f3n del dique permeable en el r\u00edo Coca, una obra clave para enfrentar la erosi\u00f3n regresiva y proteger la captaci\u00f3n de agua de la Central Hidroel\u00e9ctrica Coca Codo Sinclair de 1.500 megavatios (MW) de potencia, localizada entre las provincias de [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":4640,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"yes","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-4639","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/4639","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/comments?post=4639"}],"version-history":[{"count":1,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/4639\/revisions"}],"predecessor-version":[{"id":4641,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/posts\/4639\/revisions\/4641"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/media\/4640"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/media?parent=4639"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/categories?post=4639"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/electroguayas\/wp-json\/wp\/v2\/tags?post=4639"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}