{"id":3987,"date":"2024-08-19T14:15:23","date_gmt":"2024-08-19T19:15:23","guid":{"rendered":"https:\/\/www.celec.gob.ec\/hidroagoyan\/?p=3987"},"modified":"2024-08-19T14:15:24","modified_gmt":"2024-08-19T19:15:24","slug":"nuevos-sistemas-de-transmision-beneficiaran-a-6-5-millones-de-ecuatorianos","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/hidroagoyan\/noticias-noticias\/nuevos-sistemas-de-transmision-beneficiaran-a-6-5-millones-de-ecuatorianos\/","title":{"rendered":"Nuevos sistemas de transmisi\u00f3n beneficiar\u00e1n a 6.5 millones de ecuatorianos"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1016\" height=\"593\" src=\"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2024\/08\/obras-transmision.png\" alt=\"\" class=\"wp-image-3988\" srcset=\"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2024\/08\/obras-transmision.png 1016w, https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2024\/08\/obras-transmision-300x175.png 300w, https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2024\/08\/obras-transmision-768x448.png 768w, https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2024\/08\/obras-transmision-200x117.png 200w\" sizes=\"auto, (max-width: 1016px) 100vw, 1016px\" \/><\/figure>\n\n\n\n<p>La Corporaci\u00f3n El\u00e9ctrica del Ecuador (CELEC EP), a trav\u00e9s de su Unidad de Negocio Transelectric, avanza con la construcci\u00f3n de cuatro nuevos sistemas de transmisi\u00f3n y la ampliaci\u00f3n de una subestaci\u00f3n, que beneficiar\u00e1n a 6.5 millones de ecuatorianos, a trav\u00e9s de la mejora en el servicio de transporte de energ\u00eda el\u00e9ctrica. Se ubican en las provincias de: Guayas, El Oro, Imbabura, Cotopaxi.<\/p>\n\n\n\n<p>Estas nuevas obras robustecen la infraestructura de transmisi\u00f3n a escala nacional y dotar\u00e1n de nuevos puntos de entrega de energ\u00eda desde el Sistema Nacional de Transmisi\u00f3n (SNT) a las empresas distribuidoras, con lo que se mejorar\u00e1 la confiabilidad en el abastecimiento de energ\u00eda el\u00e9ctrica. &nbsp;<\/p>\n\n\n\n<p>Estas obras son financiadas con un cr\u00e9dito denominado BID V del Banco Interamericano de Desarrollo y con recursos propios de la CELEC EP. La inversi\u00f3n total de estos proyectos es de 147 millones de d\u00f3lares, de los cuales 101.4 millones son financiados por el BID y el resto son recursos propios de CELEC EP. Los proyectos entrar\u00e1n en operaci\u00f3n a partir del segundo trimestre 2025 hasta el \u00faltimo trimestre de 2026.<\/p>\n\n\n\n<p>El Gobierno del Ecuador, a trav\u00e9s del Ministerio de Energ\u00eda y Minas y CELEC EP, prioriza la entrega de servicios de calidad a los ciudadanos con el fin de aportar al desarrollo social y econ\u00f3mico.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Corporaci\u00f3n El\u00e9ctrica del Ecuador (CELEC EP), a trav\u00e9s de su Unidad de Negocio Transelectric, avanza con la construcci\u00f3n de cuatro nuevos sistemas de transmisi\u00f3n y la ampliaci\u00f3n de una subestaci\u00f3n, que beneficiar\u00e1n a 6.5 millones de ecuatorianos, a trav\u00e9s de la mejora en el servicio de transporte de energ\u00eda el\u00e9ctrica. Se ubican en las [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":3988,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[7],"tags":[17,27,20],"class_list":["post-3987","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias-noticias","tag-celec-ep","tag-energia-renovable","tag-sector-electrico"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-04-14 18:37:19","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts\/3987","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/comments?post=3987"}],"version-history":[{"count":1,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts\/3987\/revisions"}],"predecessor-version":[{"id":3989,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts\/3987\/revisions\/3989"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/media\/3988"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/media?parent=3987"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/categories?post=3987"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/tags?post=3987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}