{"id":4324,"date":"2025-03-27T07:46:49","date_gmt":"2025-03-27T12:46:49","guid":{"rendered":"https:\/\/www.celec.gob.ec\/hidroagoyan\/?p=4324"},"modified":"2025-03-27T07:46:49","modified_gmt":"2025-03-27T12:46:49","slug":"celec-ep-avanza-con-la-ampliacion-de-la-subestacion-jivino-en-sucumbios","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/hidroagoyan\/noticias-noticias\/celec-ep-avanza-con-la-ampliacion-de-la-subestacion-jivino-en-sucumbios\/","title":{"rendered":"CELEC EP avanza con la ampliaci\u00f3n de la subestaci\u00f3n Jivino, en Sucumb\u00edos"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"832\" height=\"547\" src=\"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2025\/03\/Sub-Jivino.jpg\" alt=\"\" class=\"wp-image-4325\" srcset=\"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2025\/03\/Sub-Jivino.jpg 832w, https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2025\/03\/Sub-Jivino-300x197.jpg 300w, https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2025\/03\/Sub-Jivino-768x505.jpg 768w, https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2025\/03\/Sub-Jivino-200x131.jpg 200w\" sizes=\"auto, (max-width: 832px) 100vw, 832px\" \/><\/figure>\n\n\n\n<p>La Corporaci\u00f3n El\u00e9ctrica del Ecuador \u2013 CELEC EP, a trav\u00e9s de su Unidad de Negocio Transelectric, avanza con la ampliaci\u00f3n de la subestaci\u00f3n Jivino 230\/69 mil voltios, ubicada en Sucumb\u00edos. La implementaci\u00f3n de este proyecto garantizar\u00e1 la calidad del servicio de transmisi\u00f3n de energ\u00eda el\u00e9ctrica en la zona nororiental del pa\u00eds. &nbsp;<\/p>\n\n\n\n<p>La ampliaci\u00f3n consiste en la instalaci\u00f3n de dos equipos de compensaci\u00f3n reactiva, de 25 MVAr (megavoltio-amperio reactivo) cada uno, a 230 mil voltios. Lo que incrementar\u00e1 la seguridad en la operaci\u00f3n del Sistema Nacional Interconectado, con la regulaci\u00f3n de los niveles de voltaje en las provincias de Sucumb\u00edos, Carchi, Imbabura y Pichincha.<\/p>\n\n\n\n<p>El nuevo equipamiento evitar\u00e1 que se registren altos voltajes en el caso de que se presente una indisponibilidad imprevista de la central hidroel\u00e9ctrica Coca Coco Sinclair. &nbsp;Adicionalmente, se brindar\u00e1 mayor seguridad a la interconexi\u00f3n el\u00e9ctrica con Colombia a nivel de 230 mil voltios.<\/p>\n\n\n\n<p>La obra se encuentra en la etapa de montaje electromec\u00e1nico y los reactores ya se encuentran en sitio. El avance general es del 67,30%.<\/p>\n\n\n\n<p>Con estas acciones, el Gobierno del Nuevo Ecuador, a trav\u00e9s del Ministerio de Energ\u00eda y Minas y CELEC EP, refuerza la infraestructura del Sistema Nacional de Transmisi\u00f3n para incrementar la confiabilidad del servicio el\u00e9ctrico a los ecuatorianos.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Corporaci\u00f3n El\u00e9ctrica del Ecuador \u2013 CELEC EP, a trav\u00e9s de su Unidad de Negocio Transelectric, avanza con la ampliaci\u00f3n de la subestaci\u00f3n Jivino 230\/69 mil voltios, ubicada en Sucumb\u00edos. La implementaci\u00f3n de este proyecto garantizar\u00e1 la calidad del servicio de transmisi\u00f3n de energ\u00eda el\u00e9ctrica en la zona nororiental del pa\u00eds. &nbsp; La ampliaci\u00f3n consiste [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":4325,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[7],"tags":[17,27,20],"class_list":["post-4324","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias-noticias","tag-celec-ep","tag-energia-renovable","tag-sector-electrico"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-05-06 03:34:35","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts\/4324","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/comments?post=4324"}],"version-history":[{"count":1,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts\/4324\/revisions"}],"predecessor-version":[{"id":4326,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts\/4324\/revisions\/4326"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/media\/4325"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/media?parent=4324"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/categories?post=4324"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/tags?post=4324"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}