{"id":4361,"date":"2025-04-21T07:38:42","date_gmt":"2025-04-21T12:38:42","guid":{"rendered":"https:\/\/www.celec.gob.ec\/hidroagoyan\/?p=4361"},"modified":"2025-04-21T07:38:43","modified_gmt":"2025-04-21T12:38:43","slug":"gobierno-nacional-ejecuta-trabajos-para-precautelar-la-operacion-de-la-central-hidroelectrica-coca-codo-sinclair","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/hidroagoyan\/noticias-noticias\/gobierno-nacional-ejecuta-trabajos-para-precautelar-la-operacion-de-la-central-hidroelectrica-coca-codo-sinclair\/","title":{"rendered":"Gobierno Nacional ejecuta trabajos para precautelar la operaci\u00f3n de la central hidroel\u00e9ctrica Coca Codo Sinclair"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"965\" height=\"537\" src=\"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2025\/04\/ER-CCS.jpg\" alt=\"\" class=\"wp-image-4362\" srcset=\"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2025\/04\/ER-CCS.jpg 965w, https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2025\/04\/ER-CCS-300x167.jpg 300w, https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2025\/04\/ER-CCS-768x427.jpg 768w, https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2025\/04\/ER-CCS-200x111.jpg 200w\" sizes=\"auto, (max-width: 965px) 100vw, 965px\" \/><\/figure>\n\n\n\n<p>El Gobierno del Nuevo Ecuador, a trav\u00e9s de la&nbsp; Corporaci\u00f3n El\u00e9ctrica del Ecuador \u2013 CELEC EP, ejecuta trabajos para precautelar la operaci\u00f3n de la central hidroel\u00e9ctrica Coca Codo Sinclair. Estas actividades consisten en el retiro de los sedimentos que se acumularon en la zona de la descarga de las aguas turbinadas de la hidroel\u00e9ctrica, como consecuencia de la erosi\u00f3n regresiva del r\u00edo Coca.<\/p>\n\n\n\n<p>Parte del material arrastrado por el r\u00edo Coca se deposita en la zona del canal de descarga de las aguas turbinadas la casa de m\u00e1quinas. Con el retiro de los sedimentos se ampl\u00eda el ancho del r\u00edo en ese sector, con lo que se disminuir\u00e1 la altura (cota) de crecida del afluente en esa &nbsp;zona.<\/p>\n\n\n\n<p>Los trabajos incluye el retiro de sedimentos (tipo aluvial), transporte y disposici\u00f3n final en un sitio seguro. Hasta el momento se han desalojado 158.378 metros c\u00fabicos de material.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>El Gobierno del Nuevo Ecuador, a trav\u00e9s de la&nbsp; Corporaci\u00f3n El\u00e9ctrica del Ecuador \u2013 CELEC EP, ejecuta trabajos para precautelar la operaci\u00f3n de la central hidroel\u00e9ctrica Coca Codo Sinclair. Estas actividades consisten en el retiro de los sedimentos que se acumularon en la zona de la descarga de las aguas turbinadas de la hidroel\u00e9ctrica, como [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":4362,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[7],"tags":[17,27,20],"class_list":["post-4361","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias-noticias","tag-celec-ep","tag-energia-renovable","tag-sector-electrico"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-04-15 08:10:20","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts\/4361","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/comments?post=4361"}],"version-history":[{"count":1,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts\/4361\/revisions"}],"predecessor-version":[{"id":4363,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts\/4361\/revisions\/4363"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/media\/4362"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/media?parent=4361"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/categories?post=4361"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/tags?post=4361"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}