{"id":490,"date":"2023-02-28T21:43:28","date_gmt":"2023-02-28T21:43:28","guid":{"rendered":"https:\/\/www.celec.gob.ec\/hidroagoyan\/?p=2430"},"modified":"2023-02-28T21:43:28","modified_gmt":"2023-02-28T21:43:28","slug":"cada-ano-la-central-manduriacu-mejora-su-produccion-de-energia-electrica","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/hidroagoyan\/noticias-noticias\/cada-ano-la-central-manduriacu-mejora-su-produccion-de-energia-electrica\/","title":{"rendered":"CADA A\u00d1O LA CENTRAL MANDURIACU MEJORA SU PRODUCCI\u00d3N DE ENERG\u00cdA EL\u00c9CTRICA"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-2429\" src=\"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2023\/02\/Cada_ao_la_central_Manduriacu_mejora_su_produccin_de_energa_elctrica.jpg\" alt=\"\" width=\"725\" height=\"541\" \/><\/p>\n<p>La central hidroel\u00e9ctrica Manduriacu, operada por la Corporaci\u00f3n El\u00e9ctrica del Ecuador, CELEC EP, en el a\u00f1o 2022 super\u00f3 la producci\u00f3n energ\u00e9tica de su dise\u00f1o (367 GWh\/a\u00f1o), aportando 374,86 gigavatios hora (GWh), al Sistema Nacional Interconectado. Desde su operaci\u00f3n comercial, en mayo de 2015, la central genera 65 megavatios (MW), abasteciendo de esta manera la demanda de 1 mill\u00f3n de ecuatorianos.<\/p>\n<p><!--more--><\/p>\n<p>En los \u00faltimos 4 a\u00f1os se evidencia el incremento en producci\u00f3n energ\u00e9tica de la Central, para el a\u00f1o 2019 aport\u00f3 con 328,65 GWh, el a\u00f1o 2020 con 344,68 GWh; y, en el a\u00f1o 2021 con 365,86 GWh. Esto se debe al incremento de la disponibilidad de las m\u00e1quinas, a la optimizaci\u00f3n del recurso h\u00eddrico, optimizaci\u00f3n de maniobras operativas en desalojo de sedimentos, cumplimiento de los planes de mantenimiento, conocimiento t\u00e9cnico del personal de la CELEC EP, adquisiciones de bienes y servicios oportunos, condiciones hidrol\u00f3gicas favorables, entre otros.<\/p>\n<p>Actualmente, en cumplimiento a los requerimientos del Operador Nacional de Energ\u00eda, CENACE, la central Manduriacu opera a su m\u00e1xima capacidad ya que, al encontrarse en la cuenca del r\u00edo Guayllabamba, en la vertiente del Pac\u00edfico, cuenta con las condiciones hidrol\u00f3gicas y la disponibilidad para la entrega de energ\u00eda el\u00e9ctrica para el pa\u00eds, en contraposici\u00f3n a las centrales de generaci\u00f3n que se ubican en la cuenca oriental del pa\u00eds que atraviesan un periodo de estiaje.<\/p>\n<p>Fecha de publicaci\u00f3n: Jueves, 23 de febrero de 2023.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La central hidroel\u00e9ctrica Manduriacu, operada por la Corporaci\u00f3n El\u00e9ctrica del Ecuador, CELEC EP, en el a\u00f1o 2022 super\u00f3 la producci\u00f3n energ\u00e9tica de su dise\u00f1o (367 GWh\/a\u00f1o), aportando 374,86 gigavatios hora (GWh), al Sistema Nacional Interconectado. Desde su operaci\u00f3n comercial, en mayo de 2015, la central genera 65 megavatios (MW), abasteciendo de esta manera la demanda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":491,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[7],"tags":[],"class_list":["post-490","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias-noticias"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-05-31 21:34:36","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts\/490","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/comments?post=490"}],"version-history":[{"count":0,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts\/490\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/media\/491"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/media?parent=490"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/categories?post=490"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/tags?post=490"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}