{"id":498,"date":"2023-02-23T12:49:12","date_gmt":"2023-02-23T12:49:12","guid":{"rendered":"https:\/\/www.celec.gob.ec\/hidroagoyan\/?p=2422"},"modified":"2023-02-23T12:49:12","modified_gmt":"2023-02-23T12:49:12","slug":"central-termogas-machala-suma-una-disponibilidad-de-65-megavatios","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/hidroagoyan\/noticias-noticias\/central-termogas-machala-suma-una-disponibilidad-de-65-megavatios\/","title":{"rendered":"CENTRAL TERMOGAS MACHALA SUMA UNA DISPONIBILIDAD DE 65 MEGAVATIOS"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-2421\" src=\"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-content\/uploads\/2023\/02\/Termogas_Machala_suma_disponibilidad.jpg\" alt=\"\" width=\"863\" height=\"466\" \/><\/p>\n<p>Personal t\u00e9cnico y administrativo de CELEC EP Termogas Machala logr\u00f3 la disponibilidad total de la Unidad de Generaci\u00f3n 6FA1 con su carga m\u00e1xima de 65MW. Esta turbina se\u00a0 encuentra\u00a0 lista\u00a0 para\u00a0 operar\u00a0 seg\u00fan\u00a0 los\u00a0 requerimientos del Operador Nacional de Electricidad (CENACE).<\/p>\n<p><!--more--><\/p>\n<p>El personal t\u00e9cnico el\u00e9ctrico, mec\u00e1nico e instrumentaci\u00f3n de Termogas Machala, como parte\u00a0 del\u00a0 plan\u00a0 anual\u00a0 de\u00a0 mantenimiento de su parque t\u00e9rmico, ejecut\u00f3 los siguientes trabajos:<\/p>\n<ul>\n<li class=\"firstItem\">Inspecci\u00f3n y limpieza de los transformadores de potencial, transformadores\u00a0 de\u00a0 corriente,\u00a0 capacitores, aisladores y barras de media tensi\u00f3n del generador el\u00e9ctrico (\u00e1rea el\u00e9ctrica).<\/li>\n<li>Desmontaje y revisi\u00f3n del sistema de excitaci\u00f3n; verificaci\u00f3n y mantenimiento de\u00a0 la\u00a0 rueda\u00a0 de\u00a0 diodos de excitaci\u00f3n (\u00e1reas el\u00e9ctrica y mec\u00e1nica).<\/li>\n<li class=\"lastItem\">Verificaci\u00f3n del estado operativo\u00a0 de\u00a0 los\u00a0 contactores y\u00a0 tarjetas\u00a0 de\u00a0 control\u00a0 asociadas\u00a0 al\u00a0 sistema\u00a0 de\u00a0 excitaci\u00f3n de la unidad (\u00e1rea de instrumentaci\u00f3n).<\/li>\n<\/ul>\n<p>Actualmente Termogas Machala posee 238 MW (megavatios)\u00a0 de\u00a0 capacidad\u00a0 instalada\u00a0 para\u00a0 generar\u00a0 energ\u00eda\u00a0 el\u00e9ctrica al\u00a0 pa\u00eds. Su capacidad sobrepasa la demanda que requiere la provincia de El Oro.<\/p>\n<p>Fecha de publicaci\u00f3n: Viernes, 17 de febrero de 2023.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Personal t\u00e9cnico y administrativo de CELEC EP Termogas Machala logr\u00f3 la disponibilidad total de la Unidad de Generaci\u00f3n 6FA1 con su carga m\u00e1xima de 65MW. Esta turbina se\u00a0 encuentra\u00a0 lista\u00a0 para\u00a0 operar\u00a0 seg\u00fan\u00a0 los\u00a0 requerimientos del Operador Nacional de Electricidad (CENACE).<\/p>\n","protected":false},"author":1,"featured_media":499,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[7],"tags":[],"class_list":["post-498","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias-noticias"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-04-16 03:07:22","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts\/498","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/comments?post=498"}],"version-history":[{"count":0,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/posts\/498\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/media\/499"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/media?parent=498"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/categories?post=498"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/hidroagoyan\/wp-json\/wp\/v2\/tags?post=498"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}