{"id":1204,"date":"2024-03-25T16:44:10","date_gmt":"2024-03-25T16:44:10","guid":{"rendered":"https:\/\/www.celec.gob.ec\/termogasmachala\/?p=1204"},"modified":"2024-03-25T16:45:57","modified_gmt":"2024-03-25T16:45:57","slug":"termogas-machala-concluyo-el-mantenimiento-de-sus-unidades-de-generacion-de-20mw","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/termogasmachala\/articulos\/termogas-machala-concluyo-el-mantenimiento-de-sus-unidades-de-generacion-de-20mw\/","title":{"rendered":"TERMOGAS MACHALA CONCLUY\u00d3 EL MANTENIMIENTO DE SUS UNIDADES DE GENERACI\u00d3N DE 20MW"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"668\" height=\"577\" src=\"https:\/\/www.celec.gob.ec\/termogasmachala\/wp-content\/uploads\/2024\/03\/imagen-tgm.png\" alt=\"\" class=\"wp-image-1205\" style=\"width:504px;height:auto\" srcset=\"https:\/\/www.celec.gob.ec\/termogasmachala\/wp-content\/uploads\/2024\/03\/imagen-tgm.png 668w, https:\/\/www.celec.gob.ec\/termogasmachala\/wp-content\/uploads\/2024\/03\/imagen-tgm-300x259.png 300w\" sizes=\"auto, (max-width: 668px) 100vw, 668px\" \/><\/figure>\n<\/div>\n\n\n<p>Concluy\u00f3 el mantenimiento en las unidades de generaci\u00f3n de 20MW de la central Termogas Machala. Los trabajos permiten que los equipos est\u00e9n disponibles para entregar energ\u00eda al pa\u00eds, cuando as\u00ed lo disponga el Operador Nacional de Electricidad \u2013 Cenace.<\/p>\n\n\n\n<p>Las tareas que se ejecutaron fueron la correcci\u00f3n de fugas del gas aislante, revisi\u00f3n del transformador principal (limpieza, lavado, pruebas el\u00e9ctricas) y trabajos preventivos en el transformador auxiliar.<\/p>\n\n\n\n<p>Adem\u00e1s, se constat\u00f3 el estado de los terminales en los transformadores de potencial, ubicados en los equipos de control del generador el\u00e9ctrico de las unidades de generaci\u00f3n TM2 y TM3 de 20MW.<\/p>\n\n\n\n<p>Tambi\u00e9n se realizaron otras actividades complementarias como la inspecci\u00f3n del sistema de inyecci\u00f3n di\u00e9sel, revisi\u00f3n del sistema de control de turbina y la instrumentaci\u00f3n de las unidades TM2 y TM3 e inspecci\u00f3n con boroscopio de la turbina de la Unidad TM3.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Concluy\u00f3 el mantenimiento en las unidades de generaci\u00f3n de 20MW de la central Termogas Machala. Los trabajos permiten que los equipos est\u00e9n disponibles para entregar energ\u00eda al pa\u00eds, cuando as\u00ed lo disponga el Operador Nacional de Electricidad \u2013 Cenace. Las tareas que se ejecutaron fueron la correcci\u00f3n de fugas del gas aislante, revisi\u00f3n del transformador [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":1205,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[7],"tags":[],"class_list":["post-1204","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articulos"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/termogasmachala\/wp-json\/wp\/v2\/posts\/1204","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/termogasmachala\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/termogasmachala\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/termogasmachala\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/termogasmachala\/wp-json\/wp\/v2\/comments?post=1204"}],"version-history":[{"count":2,"href":"https:\/\/www.celec.gob.ec\/termogasmachala\/wp-json\/wp\/v2\/posts\/1204\/revisions"}],"predecessor-version":[{"id":1207,"href":"https:\/\/www.celec.gob.ec\/termogasmachala\/wp-json\/wp\/v2\/posts\/1204\/revisions\/1207"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/termogasmachala\/wp-json\/wp\/v2\/media\/1205"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/termogasmachala\/wp-json\/wp\/v2\/media?parent=1204"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/termogasmachala\/wp-json\/wp\/v2\/categories?post=1204"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/termogasmachala\/wp-json\/wp\/v2\/tags?post=1204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}