{"id":4494,"date":"2018-09-19T17:23:02","date_gmt":"2018-09-19T22:23:02","guid":{"rendered":"https:\/\/www.celec.gob.ec\/transelectric\/?p=637"},"modified":"2018-09-19T17:23:02","modified_gmt":"2018-09-19T22:23:02","slug":"nuevo-sistema-de-transmision-esmeraldas-santo-domingo-beneficiara-a-507-mil-habitantes","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/transelectric\/uncategorized\/nuevo-sistema-de-transmision-esmeraldas-santo-domingo-beneficiara-a-507-mil-habitantes\/","title":{"rendered":"Nuevo Sistema de Transmisi\u00f3n Esmeraldas \u2013 Santo Domingo beneficiar\u00e1 a 507 mil habitantes"},"content":{"rendered":"<p style=\"margin-top: 11.25pt; margin-right: 0cm; margin-bottom: 11.25pt; margin-left: 0cm; text-align: justify; background: white;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\">La Corporaci\u00f3n El\u00e9ctrica del Ecuador, CELEC EP, construye un nuevo sistema de transmisi\u00f3n el\u00e9ctrica entre las provincias de Esmeraldas \u2013 Santo Domingo de los Ts\u00e1chilas a 230 kV.<\/span><\/p>\n<p style=\"margin-top: 11.25pt; margin-right: 0cm; margin-bottom: 11.25pt; margin-left: 0cm; text-align: justify; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\">Esta nueva obra del Gobierno Nacional, mejorar\u00e1 las condiciones de seguridad del servicio de transmisi\u00f3n de energ\u00eda a la provincia Verde, asegurando el abastecimiento de la demanda de energ\u00eda el\u00e9ctrica para optimizar las condiciones de continuidad del servicio a los clientes de CNEL EP Esmeraldas.<\/span><\/p>\n<p style=\"margin-top: 11.25pt; margin-right: 0cm; margin-bottom: 11.25pt; margin-left: 0cm; text-align: justify; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\">Con una inversi\u00f3n aproximada de 66.5 millones de d\u00f3lares, esta obra beneficia a 507.387 habitantes de la provincia de Esmeraldas; y a futuro abastecer\u00e1 el crecimiento de la demanda de energ\u00eda el\u00e9ctrica de la Refiner\u00eda con su conexi\u00f3n a nivel de 230 kV.<\/span><\/p>\n<p style=\"margin: 11.25pt 0cm; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; text-align: center;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-634\" alt=\"ESME SANTO2\" height=\"334\" width=\"500\" src=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2018\/09\/ESME-SANTO2.jpg\" \/><br \/><\/span><\/p>\n<p style=\"margin-top: 11.25pt; margin-right: 0cm; margin-bottom: 11.25pt; margin-left: 0cm; text-align: justify; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\">La ejecuci\u00f3n de este sistema ha generado 1522 plazas de trabajo, con empleo directo e indirecto; las obras que conforman el proyecto son:<\/span><\/p>\n<p style=\"margin-top: 11.25pt; margin-right: 0cm; margin-bottom: 11.25pt; margin-left: 0cm; text-align: justify; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px;\"><strong><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\">Ampliaci\u00f3n de la subestaci\u00f3n Santo Domingo, patio 230 kV.<\/span><\/strong><br \/><strong><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\"> L\u00ednea de transmisi\u00f3n Santo Domingo \u2013 Esmeraldas a 230 kV, con 157 km de longitud.<\/span><\/strong><br \/><strong><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\"> Subestaci\u00f3n Esmeraldas a 230\/138 kV, 167 MVA.<\/span><\/strong><\/p>\n<p style=\"margin-top: 11.25pt; margin-right: 0cm; margin-bottom: 11.25pt; margin-left: 0cm; text-align: justify; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px;\">\u00a0<\/p>\n<p style=\"margin: 11.25pt 0cm; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; text-align: center;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-635\" alt=\"ESME SANTO3\" height=\"334\" width=\"500\" src=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2018\/09\/ESME-SANTO3.jpg\" \/><br \/><\/span><\/p>\n<p style=\"margin-top: 11.25pt; margin-right: 0cm; margin-bottom: 11.25pt; margin-left: 0cm; text-align: justify; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\">La puesta en operaci\u00f3n de este sistema permitir\u00e1 incrementar la confiabilidad del servicio de energ\u00eda en la zona noroccidental del pa\u00eds a trav\u00e9s del anillo el\u00e9ctrico que se formar\u00e1 entre las subestaciones Esmeraldas, Quinind\u00e9 y Santo Domingo a nivel de 138 kV, para abastecer esta zona; y conectar\u00e1 a nivel de 230 kV a las subestaciones Esmeraldas y Santo Domingo.<\/span><\/p>\n<p style=\"margin-top: 11.25pt; margin-right: 0cm; margin-bottom: 11.25pt; margin-left: 0cm; text-align: justify; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\">El Gobierno Nacional trabaja por el desarrollo y bienestar de todos los ecuatorianos, fortaleciendo el sector el\u00e9ctrico a trav\u00e9s de la ejecuci\u00f3n de nuevas obras de transmisi\u00f3n que activan la productividad.<\/span><\/p>\n<p style=\"margin: 11.25pt 0cm; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; text-align: center;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt;\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-636\" alt=\"ESME SANTO1\" height=\"333\" width=\"500\" src=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2018\/09\/ESME-SANTO1.jpg\" \/><br \/><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Corporaci\u00f3n El\u00e9ctrica del Ecuador, CELEC EP, construye un nuevo sistema de transmisi\u00f3n el\u00e9ctrica entre las provincias de Esmeraldas \u2013 Santo Domingo de los Ts\u00e1chilas a 230 kV. Esta nueva obra del Gobierno Nacional, mejorar\u00e1 las condiciones de seguridad del servicio de transmisi\u00f3n de energ\u00eda a la provincia Verde, asegurando el abastecimiento de la demanda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4495,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4494","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/4494","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/comments?post=4494"}],"version-history":[{"count":0,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/4494\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/media\/4495"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/media?parent=4494"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/categories?post=4494"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/tags?post=4494"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}