{"id":4572,"date":"2017-08-15T18:30:55","date_gmt":"2017-08-15T23:30:55","guid":{"rendered":"https:\/\/www.celec.gob.ec\/transelectric\/?p=1733"},"modified":"2017-08-15T18:30:55","modified_gmt":"2017-08-15T23:30:55","slug":"quevedo-san-gregorio-san-juan","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/transelectric\/uncategorized\/quevedo-san-gregorio-san-juan\/","title":{"rendered":"CELEC EP SUSCRIBE CONTRATO PARA EJECUTAR SISTEMA DE TRANSMISI\u00d3N QUEVEDO \u2013 SAN GREGORIO \u2013 SAN JUAN DE MANTA"},"content":{"rendered":"<p><span style=\"font-size: 10pt;\">El Doctor Francisco Vergara, Gerente General de la Corporaci\u00f3n El\u00e9ctrica del Ecuador CELEC EP; y el se\u00f1or Zhong Yao Wu, Gerente General de la empresa XIAN Electric Engineering; suscribieron este lunes 14 de agosto el contrato para la ejecuci\u00f3n del&nbsp; Sistema de Transmisi\u00f3n, <b style=\"font-family: inherit; font-style: inherit;\">QUEVEDO \u2013 SAN GREGORIO \u2013 SAN JUAN DE MANTA&nbsp; 230\/69 kV, 225 MVA.<\/b><\/span><\/p>\n<p><span style=\"font-size: 10pt;\"><b>&nbsp;<\/b>En la&nbsp; firma particip\u00f3 el Ing. Jorge Jaramillo, Gerente de CELEC EP TRANSELECTRIC, Unidad de Negocio responsable de la ejecuci\u00f3n de este importante proyecto, adem\u00e1s de directivos de ambas empresas.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">La construcci\u00f3n de este sistema de transmisi\u00f3n mejorar\u00e1 las condiciones de suministro de energ\u00eda en la provincia de Manab\u00ed, garantizando la confiabilidad de este servicio p\u00fablico. Con la implementaci\u00f3n de la subestaci\u00f3n San Juan de Manta se dotar\u00e1 de un nuevo punto de entrega a CNEL EP Manab\u00ed, satisfaciendo de esta manera el alto crecimiento energ\u00e9tico generado por el desarrollo del sector inmobiliario en la zona de Manta, la operaci\u00f3n del puerto mar\u00edtimo y su impacto en el desarrollo de esta ciudad.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\"><b>Las obras que forman parte de este sistema son:<\/b><\/span><\/p>\n<ul>\n<li><span style=\"font-size: 10pt;\">Subestaci\u00f3n Quevedo 230 kV, ampliaci\u00f3n.<\/span><\/li>\n<li><span style=\"font-size: 10pt;\">Subestaci\u00f3n San Gregorio 230 kV, ampliaci\u00f3n.<\/span><\/li>\n<li><span style=\"font-size: 10pt;\">Construcci\u00f3n Subestaci\u00f3n San Juan de Manta 230\/69 kV, 225 MVA.<\/span><\/li>\n<li><span style=\"font-size: 10pt;\">Construcci\u00f3n L\u00ednea de Transmisi\u00f3n 230 kV San Gregorio \u2013 San Juan de Manta doble circuito, conductor 1200 ACAR, 41 km.<\/span><\/li>\n<\/ul>\n<table border=\"0\">\n<tbody>\n<tr>\n<td colspan=\"2\"><img loading=\"lazy\" decoding=\"async\" style=\"display: block; margin-left: auto; margin-right: auto;\" alt=\"FIRMA 1\" height=\"331\" width=\"503\" src=\"images\/stories\/noticias\/15-08-2017\/FIRMA%201.jpg\" \/><\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\"><img loading=\"lazy\" decoding=\"async\" src=\"images\/stories\/noticias\/15-08-2017\/FIRMA%202.jpg\" width=\"503\" height=\"394\" alt=\"FIRMA 2\" style=\"display: block; margin-left: auto; margin-right: auto;\" \/><\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\"><img loading=\"lazy\" decoding=\"async\" style=\"display: block; margin-left: auto; margin-right: auto;\" alt=\"FIRMA 4\" height=\"311\" width=\"503\" src=\"images\/stories\/noticias\/15-08-2017\/FIRMA%204.jpg\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>El Doctor Francisco Vergara, Gerente General de la Corporaci\u00f3n El\u00e9ctrica del Ecuador CELEC EP; y el se\u00f1or Zhong Yao Wu, Gerente General de la empresa XIAN Electric Engineering; suscribieron este lunes 14 de agosto el contrato para la ejecuci\u00f3n del&nbsp; Sistema de Transmisi\u00f3n, QUEVEDO \u2013 SAN GREGORIO \u2013 SAN JUAN DE MANTA&nbsp; 230\/69 kV, 225 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4572","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/4572","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/comments?post=4572"}],"version-history":[{"count":0,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/4572\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/media?parent=4572"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/categories?post=4572"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/tags?post=4572"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}