{"id":4641,"date":"2019-05-19T17:31:43","date_gmt":"2019-05-19T22:31:43","guid":{"rendered":"https:\/\/www.celec.gob.ec\/transelectric\/?p=2026"},"modified":"2019-05-19T17:31:43","modified_gmt":"2019-05-19T22:31:43","slug":"celec-ep-refuerza-el-sistema-para-el-abastecimiento-de-energia-electrica-en-la-provincia-de-los-rios","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/transelectric\/uncategorized\/celec-ep-refuerza-el-sistema-para-el-abastecimiento-de-energia-electrica-en-la-provincia-de-los-rios\/","title":{"rendered":"CELEC EP refuerza el sistema para el abastecimiento de energ\u00eda el\u00e9ctrica en la provincia de Los R\u00edos"},"content":{"rendered":"<p><span style=\"font-size: 10pt;\">La Corporaci\u00f3n El\u00e9ctrica del Ecuador CELEC EP, a trav\u00e9s de su Unidad de Negocio Transelectric, energiz\u00f3, el domingo 19 de mayo de 2019, el segundo circuito de la nueva l\u00ednea Milagro -Babahoyo a 138 kV. La obra permite el reforzamiento del servicio de transmisi\u00f3n de energ\u00eda el\u00e9ctrica para la provincia de Los R\u00edos, a trav\u00e9s de un nuevo punto de conexi\u00f3n desde el Sistema Nacional Interconectado a la empresa distribuidora CNEL EP, Unidad de Negocio Los R\u00edos.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">Con el fin de ejecutar las labores de forma \u00f3ptima se conformaron cuatro frentes de trabajo, para desarrollar las actividades programadas que permitieron la entrada en operaci\u00f3n de los dos nuevos circuitos.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">Con estas nuevas instalaciones, CELEC EP Transelectric duplica la capacidad de transmisi\u00f3n de la infraestructura existente en esta importante zona del pa\u00eds, con la construcci\u00f3n de la l\u00ednea de transmisi\u00f3n Milagro \u2013 Babahoyo, doble circuito de 42 km de longitud y la ampliaci\u00f3n de 2 bah\u00edas de 138 kV y una bah\u00eda de 69 kV en la subestaci\u00f3n Babahoyo, complementadas con la ampliaci\u00f3n de una bah\u00eda de 138 kV en la subestaci\u00f3n Milagro.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">Estas obras constituyen el nuevo sistema de transmisi\u00f3n Milagro \u2013 Babahoyo, que inici\u00f3 su ejecuci\u00f3n en octubre 2017 y actualmente encuentra totalmente operativo.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">La inversi\u00f3n aproximada de esta obra de transmisi\u00f3n de energ\u00eda es de 23.3 millones de d\u00f3lares, y beneficia directamente a los habitantes de la provincia de Los R\u00edos, mejorando la confiablidad y continuidad del suministro de energ\u00eda el\u00e9ctrica, y abastecer\u00e1 el incremento de la demanda de CNEL EP Los R\u00edos, adem\u00e1s de CNEL EP Bol\u00edvar, para lo cual est\u00e1 disponible la posici\u00f3n de 69 kV para que la distribuidora se conecte en el corto plazo.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">El Gobierno de Todos trabaja en beneficio de los ecuatorianos fortaleciendo el sector el\u00e9ctrico a trav\u00e9s de nuevas obras de transmisi\u00f3n de energ\u00eda el\u00e9ctrica que impulsan el desarrollo social y productiv<\/span>o.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-2023\" src=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2019\/05\/Foto-1.jpeg\" alt=\"Foto 1\" width=\"500\" height=\"281\" style=\"margin: 10px;\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-2024\" src=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2019\/05\/Foto-3.jpeg\" alt=\"Foto 3\" width=\"281\" height=\"500\" style=\"margin: 10px auto; display: block;\" \/><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-2025\" src=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2019\/05\/Foto-2.jpeg\" alt=\"Foto 2\" width=\"500\" height=\"282\" style=\"margin: 10px;\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Corporaci\u00f3n El\u00e9ctrica del Ecuador CELEC EP, a trav\u00e9s de su Unidad de Negocio Transelectric, energiz\u00f3, el domingo 19 de mayo de 2019, el segundo circuito de la nueva l\u00ednea Milagro -Babahoyo a 138 kV. La obra permite el reforzamiento del servicio de transmisi\u00f3n de energ\u00eda el\u00e9ctrica para la provincia de Los R\u00edos, a trav\u00e9s [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4642,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4641","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/4641","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/comments?post=4641"}],"version-history":[{"count":0,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/4641\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/media\/4642"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/media?parent=4641"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/categories?post=4641"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/tags?post=4641"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}