{"id":4696,"date":"2020-10-08T17:03:45","date_gmt":"2020-10-08T22:03:45","guid":{"rendered":"https:\/\/www.celec.gob.ec\/transelectric\/?p=2505"},"modified":"2020-10-08T17:03:45","modified_gmt":"2020-10-08T22:03:45","slug":"nuevo-sistema-de-transmision-tabacundo-pimampiro-imbabura-reporta-un-avance-del-85-35","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/transelectric\/uncategorized\/nuevo-sistema-de-transmision-tabacundo-pimampiro-imbabura-reporta-un-avance-del-85-35\/","title":{"rendered":"Nuevo sistema de transmisi\u00f3n Tabacundo (Pimampiro) \u2013 Imbabura reporta un avance del 85.35%"},"content":{"rendered":"<p><strong>Pimampiro, 08 de octubre de 2020<\/strong><\/p>\n<p>El nuevo sistema de transmisi\u00f3n el\u00e9ctrico Tabacundo (Pimampiro) a 230\/138 mil voltios, impulsado por el Gobierno Nacional, a trav\u00e9s del Ministerio de Energ\u00eda y Recursos Naturales No Renovables&nbsp; y la Corporaci\u00f3n El\u00e9ctrica del Ecuador CELEC EP, se encuentra en su \u00faltima fase de construcci\u00f3n<\/p>\n<p>Este sistema reforzar\u00e1 la confiabilidad del servicio de energ\u00eda el\u00e9ctrica para las provincias de Imbabura y Carchi, y ser\u00e1 el nuevo punto de interconexi\u00f3n con Colombia.<\/p>\n<p>La obra est\u00e1 a cargo de la &nbsp;Unidad de Negocio TRANSELECTRIC y dotar\u00e1 de un segundo punto de conexi\u00f3n a 230 mil voltios desde el Sistema Nacional de Transmisi\u00f3n (SNT),&nbsp; a la Empresa El\u00e9ctrica Regional Norte (EMELNORTE). De esta forma, se incrementar\u00e1 la confiabilidad del servicio de transmisi\u00f3n el\u00e9ctrica y se asegurar\u00e1 el abastecimiento de la demanda actual y futura a &nbsp;la empresa distribuidora y sus zonas de influencia.<\/p>\n<p>Este jueves 8 de octubre de 2020, el gerente general&nbsp; de CELEC EP, Ing. Gonzalo Uquillas Vallejo, conjuntamente con el interventor, Ing. Ra\u00fal Maldonado Ruales, y el equipo t\u00e9cnico de la Unidad de Negocio Transelectric recorrieron los frentes de trabajo, para verificar el avance de la obra. &nbsp;<\/p>\n<p>Gonzalo Uquillas indic\u00f3 que \u201cel nuevo sistema de transmisi\u00f3n presenta dos ventajas fundamentales: primero se trasladar\u00e1 el punto de la interconexi\u00f3n el\u00e9ctrica Ecuador \u2013 Colombia, desde la subestaci\u00f3n Pomasqui a la nueva subestaci\u00f3n Pimampiro, de 230\/138 mil voltios, a trav\u00e9s de cuatro l\u00edneas de transmisi\u00f3n a 230 mil voltios y se fortalecer\u00e1 el suministro de energ\u00eda el\u00e9ctrica a la empresa distribuidora de la zona, EMELENORTE\u201d.<\/p>\n<p>Las obras que conforman el sistema son:<\/p>\n<ul>\n<li>Subestaci\u00f3n Pimampiro, 230\/138 mil voltios, 225MVA (que est\u00e1 construida en una superficie de 15 hect\u00e1reas.)<\/li>\n<li>L\u00ednea de transmisi\u00f3n 230 mil voltios.<\/li>\n<li>L\u00ednea de transmisi\u00f3n 138 mil voltios.<\/li>\n<\/ul>\n<p>La obra tiene una inversi\u00f3n aproximada de USD 39.2 millones, reporta un avance &nbsp;del &nbsp;85.35% y ha generado 290 fuentes de empleo directo e indirecto. Con el reinicio de la obra, durante la pandemia, tambi\u00e9n se contribuy\u00f3 a reactivar el desarrollo productivo de la zona de influencia. El Gobierno Nacional, con este nuevo sistema, mejorar\u00e1 el servicio de energ\u00eda en la zona norte del pa\u00eds y beneficiar\u00e1 a 526.768 habitantes de Imbabura y Carchi.<\/p>\n<p> En el siguiente link se adjunta el material fotogr\u00e1fico, tomas de paso y entrevista del Gerente General de CELEC EP.<\/p>\n<p><a href=\"https:\/\/drive.google.com\/drive\/folders\/1jOFV56N1hLpiHyXe3sABaM86GmCt5pyP?usp=sharing\"><\/a><a href=\"https:\/\/drive.google.com\/drive\/folders\/1jOFV56N1hLpiHyXe3sABaM86GmCt5pyP?usp=sharing\">https:\/\/drive.google.com\/drive\/folders\/1jOFV56N1hLpiHyXe3sABaM86GmCt5pyP?usp=sharing<\/a><\/p>\n<p style=\"text-align: center;\">&nbsp;<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-2503\" src=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2020\/10\/1pimampiro11.jpg\" alt=\"1pimampiro11\" width=\"500\" height=\"334\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-2504\" src=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2020\/10\/1pimampiro1.jpg\" alt=\"1pimampiro1\" width=\"500\" height=\"334\" style=\"display: block; margin-left: auto; margin-right: auto;\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pimampiro, 08 de octubre de 2020 El nuevo sistema de transmisi\u00f3n el\u00e9ctrico Tabacundo (Pimampiro) a 230\/138 mil voltios, impulsado por el Gobierno Nacional, a trav\u00e9s del Ministerio de Energ\u00eda y Recursos Naturales No Renovables&nbsp; y la Corporaci\u00f3n El\u00e9ctrica del Ecuador CELEC EP, se encuentra en su \u00faltima fase de construcci\u00f3n Este sistema reforzar\u00e1 la confiabilidad [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4697,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4696","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/4696","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/comments?post=4696"}],"version-history":[{"count":0,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/4696\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/media\/4697"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/media?parent=4696"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/categories?post=4696"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/tags?post=4696"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}