{"id":4769,"date":"2020-04-13T23:11:55","date_gmt":"2020-04-14T04:11:55","guid":{"rendered":"https:\/\/www.celec.gob.ec\/transelectric\/?p=2324"},"modified":"2020-04-13T23:11:55","modified_gmt":"2020-04-14T04:11:55","slug":"celec-ep-transelectric-entrego-mas-insumos-de-bioseguridad-para-las-instalaciones-del-sistema-nacional-de-transmision","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/transelectric\/uncategorized\/celec-ep-transelectric-entrego-mas-insumos-de-bioseguridad-para-las-instalaciones-del-sistema-nacional-de-transmision\/","title":{"rendered":"CELEC EP TRANSELECTRIC entreg\u00f3 m\u00e1s insumos de bioseguridad para las instalaciones del Sistema Nacional de Transmisi\u00f3n"},"content":{"rendered":"<p>Quito, 13 de abril de 2020<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\"><span data-contrast=\"auto\">La<\/span><span data-contrast=\"auto\">&nbsp;Corporaci\u00f3n El\u00e9ctrica del Ecuador,&nbsp;<\/span><span data-contrast=\"auto\">a trav\u00e9s de su Unidad de Negocio<\/span><span data-contrast=\"auto\">&nbsp;Transelectric<\/span><span data-contrast=\"auto\">,<\/span><span data-contrast=\"auto\"><\/span><span data-contrast=\"auto\">entreg\u00f3, este fin de semana,&nbsp;<\/span><span data-contrast=\"none\">equipos de protecci\u00f3n per<\/span><span data-contrast=\"none\">sonal y productos de&nbsp;<\/span><span data-contrast=\"none\">limpieza y&nbsp;<\/span><span data-contrast=\"none\">desinfecci\u00f3n en t<\/span><span data-contrast=\"none\">odas las instalaciones del Sistem<\/span><span data-contrast=\"none\">a Nacional de Transmisi\u00f3n (<\/span><span data-contrast=\"none\">SNT<\/span><span data-contrast=\"none\">)<\/span><span data-contrast=\"none\">:<\/span><span data-contrast=\"none\"><\/span><span data-contrast=\"none\">subestaciones<\/span><span data-contrast=\"none\">&nbsp;situadas<\/span><span data-contrast=\"none\">&nbsp;en las<\/span><span data-contrast=\"none\">&nbsp;diferentes provincias del pa\u00eds,&nbsp;<\/span><span data-contrast=\"none\">Centro de Operaci\u00f3n de Transmisi\u00f3n<\/span><span data-contrast=\"none\">&nbsp;(COT)<\/span><span data-contrast=\"none\"><\/span><span data-contrast=\"none\">y&nbsp;<\/span><span data-contrast=\"none\">Centro de Gesti\u00f3n de Telecomunicaciones<\/span><span data-contrast=\"none\">&nbsp;(CGT)<\/span><span data-contrast=\"none\">, ubicados en Quito.<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\"><\/span><\/p>\n<p style=\"text-align: justify;\"><span data-contrast=\"auto\">E<\/span><span data-contrast=\"auto\">sta dotaci\u00f3n de&nbsp;<\/span><span data-contrast=\"auto\">&nbsp;insumos de bioseguridad<\/span><span data-contrast=\"auto\">:<\/span><span data-contrast=\"auto\"><\/span><span data-contrast=\"none\">m<\/span><span data-contrast=\"none\">ascarillas, guantes desechables, alcohol, gel antibacterial, desinfectante<\/span><span data-contrast=\"none\">, jab\u00f3n y&nbsp;<\/span><span data-contrast=\"none\">gafas de protecci\u00f3n<\/span><span data-contrast=\"none\">&nbsp;para&nbsp;<\/span><span data-contrast=\"auto\">e<\/span><span data-contrast=\"auto\">l personal de operaci\u00f3n y&nbsp;<\/span><span data-contrast=\"auto\">mantenimiento<\/span><span data-contrast=\"auto\"><\/span><span data-contrast=\"auto\">que labora&nbsp;<\/span><span data-contrast=\"auto\">de forma presencial&nbsp;<\/span><span data-contrast=\"auto\">en&nbsp;<\/span><span data-contrast=\"auto\">las instalaciones de transmisi\u00f3n<\/span><span data-contrast=\"auto\">,<\/span><span data-contrast=\"auto\">&nbsp;conjuntamente con las medidas de higiene&nbsp;<\/span><span data-contrast=\"auto\">personal permanentes<\/span><span data-contrast=\"auto\">,&nbsp;<\/span><span data-contrast=\"auto\">&nbsp;contribuyen a minimizar el riesgo<\/span><span data-contrast=\"auto\">&nbsp;de contagio por<\/span><span data-contrast=\"auto\">&nbsp;COVID<\/span><span data-contrast=\"auto\">-19.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559740&quot;:231}\"><\/span><\/p>\n<p style=\"text-align: justify;\"><span data-contrast=\"auto\">Para lograr este&nbsp; prop\u00f3sito<\/span><span data-contrast=\"auto\"><\/span><span data-contrast=\"auto\">personal de la&nbsp;<\/span><span data-contrast=\"auto\">Unidad de Negocio&nbsp;<\/span><span data-contrast=\"auto\">Transelectric<\/span><span data-contrast=\"auto\"><\/span><span data-contrast=\"auto\">recorri\u00f3&nbsp;<\/span><span data-contrast=\"auto\">varias provincias<\/span><span data-contrast=\"auto\">&nbsp;para realizar la entrega<\/span><span data-contrast=\"auto\"><\/span><span data-contrast=\"auto\">de&nbsp;<\/span><span data-contrast=\"auto\">este equipamiento de bioseguridad<\/span><span data-contrast=\"auto\">,<\/span><span data-contrast=\"auto\"><\/span><span data-contrast=\"auto\">lo&nbsp;<\/span><span data-contrast=\"auto\">que permite<\/span><span data-contrast=\"auto\">&nbsp;que nuestros<\/span><span data-contrast=\"auto\">&nbsp;trabajadores<\/span><span data-contrast=\"auto\">&nbsp;que laboran de forma ininterrumpida, durante las 24<\/span><span data-contrast=\"auto\">&nbsp;horas<\/span><span data-contrast=\"auto\">,&nbsp;<\/span><span data-contrast=\"auto\">cuenten con lo necesario durante esta crisi<\/span><span data-contrast=\"auto\">s<\/span><span data-contrast=\"auto\">&nbsp;sanitaria.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559740&quot;:231}\"><\/span><\/p>\n<p style=\"text-align: justify;\"><span data-contrast=\"auto\">Asimismo<\/span><span data-contrast=\"auto\">,<\/span><span data-contrast=\"auto\">&nbsp;se&nbsp;<\/span><span data-contrast=\"auto\">realizan<\/span><span data-contrast=\"auto\">&nbsp;las gestion<\/span><span data-contrast=\"auto\">es necesarias para efectuar&nbsp;<\/span><span data-contrast=\"auto\">las pruebas de COVID-19, al personal de operaci\u00f3n ubicado en Guayaquil y Quito,&nbsp;<\/span><span data-contrast=\"auto\">ciudades<\/span><span data-contrast=\"auto\">&nbsp;de mayor concentraci\u00f3n de casos<\/span><span data-contrast=\"auto\">.<\/span><span data-contrast=\"auto\">&nbsp;&nbsp;<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559740&quot;:231}\"><\/span><\/p>\n<p style=\"text-align: justify;\"><span data-contrast=\"auto\">Estas acciones&nbsp;<\/span><span data-contrast=\"auto\">evidencian el cumplimiento<\/span><span data-contrast=\"auto\">&nbsp;del protocolo&nbsp;<\/span><span data-contrast=\"auto\">sanitario<\/span><span data-contrast=\"auto\">&nbsp;de CELEC EP contra el COVID-19<\/span><span data-contrast=\"auto\">&nbsp;y<\/span><span data-contrast=\"auto\"><\/span><span data-contrast=\"auto\">proteg<\/span><span data-contrast=\"auto\">en la salud del personal<\/span><span data-contrast=\"auto\">&nbsp;para&nbsp;<\/span><span data-contrast=\"auto\">garantiza<\/span><span data-contrast=\"auto\">r<\/span><span data-contrast=\"auto\"><\/span><span data-contrast=\"auto\">la o<\/span><span data-contrast=\"auto\">peratividad<\/span><span data-contrast=\"auto\">&nbsp;del&nbsp;<\/span><span data-contrast=\"auto\">Sistema Nacional de Transmisi\u00f3n&nbsp;<\/span><span data-contrast=\"auto\">SNT-&nbsp;<\/span><span data-contrast=\"auto\">y brindar&nbsp;<\/span><span data-contrast=\"auto\">continuidad<\/span><span data-contrast=\"auto\"><\/span><span data-contrast=\"auto\">en<\/span><span data-contrast=\"auto\"><\/span><span data-contrast=\"auto\">la entrega d<\/span><span data-contrast=\"auto\">el servicio de transmisi\u00f3n de energ\u00eda el\u00e9ctrica a nivel nacional,&nbsp;<\/span><span data-contrast=\"auto\">durante l<\/span><span data-contrast=\"auto\">a emergencia sanitaria.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559740&quot;:231}\"><\/span><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-2320\" src=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2020\/04\/1entrega1.jpg\" alt=\"1entrega1\" width=\"500\" height=\"375\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-2321\" style=\"display: block; margin-left: auto; margin-right: auto;\" src=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2020\/04\/1entrega11.jpg\" alt=\"1entrega11\" width=\"500\" height=\"281\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-2322\" style=\"display: block; margin-left: auto; margin-right: auto;\" src=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2020\/04\/1entrega111.jpg\" alt=\"1entrega111\" width=\"500\" height=\"375\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-2323\" style=\"display: block; margin-left: auto; margin-right: auto;\" src=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2020\/04\/1entrega1111.jpg\" alt=\"1entrega1111\" width=\"500\" height=\"281\" \/><\/p>\n<p style=\"text-align: justify;\"><span data-contrast=\"none\"><\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335551550&quot;:2,&quot;335551620&quot;:2,&quot;335559740&quot;:231,&quot;469777462&quot;:[5265],&quot;469777927&quot;:[0],&quot;469777928&quot;:[1]}\"><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Quito, 13 de abril de 2020 &nbsp; La&nbsp;Corporaci\u00f3n El\u00e9ctrica del Ecuador,&nbsp;a trav\u00e9s de su Unidad de Negocio&nbsp;Transelectric,entreg\u00f3, este fin de semana,&nbsp;equipos de protecci\u00f3n personal y productos de&nbsp;limpieza y&nbsp;desinfecci\u00f3n en todas las instalaciones del Sistema Nacional de Transmisi\u00f3n (SNT):subestaciones&nbsp;situadas&nbsp;en las&nbsp;diferentes provincias del pa\u00eds,&nbsp;Centro de Operaci\u00f3n de Transmisi\u00f3n&nbsp;(COT)y&nbsp;Centro de Gesti\u00f3n de Telecomunicaciones&nbsp;(CGT), ubicados en Quito. Esta dotaci\u00f3n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4770,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4769","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/4769","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/comments?post=4769"}],"version-history":[{"count":0,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/4769\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/media\/4770"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/media?parent=4769"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/categories?post=4769"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/tags?post=4769"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}