{"id":9080,"date":"2024-11-15T17:38:12","date_gmt":"2024-11-15T22:38:12","guid":{"rendered":"https:\/\/www.celec.gob.ec\/transelectric\/?p=9080"},"modified":"2025-03-17T13:17:52","modified_gmt":"2025-03-17T18:17:52","slug":"el-nuevo-sistema-de-transmision-electrica-tanicuchi-registra-un-avance-del-62","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/transelectric\/uncategorized\/el-nuevo-sistema-de-transmision-electrica-tanicuchi-registra-un-avance-del-62\/","title":{"rendered":"El nuevo sistema de transmisi\u00f3n el\u00e9ctrica Tanicuch\u00ed registra un avance del 62%"},"content":{"rendered":"\n<p class=\"has-text-align-left\">La construcci\u00f3n del nuevo sistema de transmisi\u00f3n el\u00e9ctrica Tanicuch\u00ed a 230\/138 mil voltios, 150 MVA (megavoltamperios) registra un avance del 62 %. As\u00ed lo verificaron las autoridades de la provincia de Cotopaxi y de la Corporaci\u00f3n El\u00e9ctrica del Ecuador \u2013 CELEC EP, este viernes 15 de noviembre de 2024, durante un recorrido por el sitio de los trabajos.<\/p>\n\n\n\n<p>Las nuevas instalaciones permitir\u00e1n atender los requerimientos de la demanda de energ\u00eda de la provincia, a trav\u00e9s de un nuevo punto de conexi\u00f3n desde el Sistema Nacional de Transmisi\u00f3n para la Empresa El\u00e9ctrica Cotopaxi (ELEPCO S.A.).<\/p>\n\n\n\n<p>La obra es ejecutada por la Unidad de Negocio TRANSELECTRIC con una inversi\u00f3n de USD 38 millones. Est\u00e1 conformada por una subestaci\u00f3n el\u00e9ctrica y tres l\u00edneas de transmisi\u00f3n. Al momento se trabaja en la instalaci\u00f3n de los elementos electromec\u00e1nicos, ya se encuentran en el sitio los dos transformadores de 75 MWA (megavoltioamperios) cada uno, que suman una capacidad de transformaci\u00f3n de 150 MWA.<\/p>\n\n\n\n<p>En el recorrido participaron la prefecta provincial, Lourdes Tib\u00e1n; el gobernador de la provincia, Nelson S\u00e1nchez; gerente de CELEC EP Transelectric, Ra\u00fal Villafuerte y delegados de la Empresa El\u00e9ctrica Cotopaxi S.A.<\/p>\n\n\n\n<p>Ra\u00fal Villafuerte destac\u00f3 que el funcionamiento de esta obra fortalecer\u00e1 la entrega de energ\u00eda para el centro norte del pa\u00eds y, adem\u00e1s, garantizar\u00e1 la continuidad del servicio.<br>De su lado, la prefecta Tib\u00e1n indic\u00f3 que, sin duda, esta obra potenciar\u00e1 el desarrollo de la provincia porque garantizar\u00e1 la entrega de energ\u00eda para el desarrollo del sector productivo y generar\u00e1 nuevas fuentes de empleo, pues la mano de obra que trabaja en este proyecto es esta localidad.<\/p>\n\n\n\n<p>Nelson S\u00e1nchez, gobernador de la provincia, ponder\u00f3 la importancia de esta obra, ya que resuelve dos alertas que tiene la provincia con respecto al servicio el\u00e9ctrico: la continuidad del servicio en el caso de erupci\u00f3n del volc\u00e1n Cotopaxi e incrementar la capacidad de entrega de energ\u00eda para la provincia, a trav\u00e9s de ELEPCO S.A, con una subestaci\u00f3n mucho m\u00e1s moderna.<\/p>\n\n\n\n<p class=\"has-text-align-left\">El Gobierno del Nuevo Ecuador, a trav\u00e9s del Ministerio de Energ\u00eda y Minas y de CELEC EP, impulsa y ejecuta de forma permanente nuevas obras de transmisi\u00f3n de energ\u00eda en todo el pa\u00eds, con el fin de contar con un servicio el\u00e9ctrico confiable, que permita un adecuado abastecimiento de electricidad y nuevas oportunidades de desarrollo social y econ\u00f3mico.<\/p>\n\n\n\n<p class=\"has-text-align-left\"><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"400\" src=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2024\/11\/tANIWWEB-1.png\" alt=\"\" class=\"wp-image-9082\" style=\"width:685px;height:auto\" srcset=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2024\/11\/tANIWWEB-1.png 600w, https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2024\/11\/tANIWWEB-1-300x200.png 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"has-text-align-center\">Autoridades de Cotopaxi y de CELEC EP recorrieron el sitio de construcci\u00f3n de subestaci\u00f3n Tanicuch\u00ed.<\/p>\n\n\n\n<p class=\"has-text-align-center\"><strong><a href=\"https:\/\/drive.google.com\/drive\/folders\/10Zk5Z1p35KaSsS4zcKd5ZXm3nXngGjXk?usp=sharing\" data-type=\"link\" data-id=\"https:\/\/drive.google.com\/drive\/folders\/10Zk5Z1p35KaSsS4zcKd5ZXm3nXngGjXk?usp=sharing\">Para acceder a m\u00e1s fotograf\u00edas hacer clic aqu\u00ed<\/a><\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>La construcci\u00f3n del nuevo sistema de transmisi\u00f3n el\u00e9ctrica Tanicuch\u00ed a 230\/138 mil voltios, 150 MVA (megavoltamperios) registra un avance del 62 %. As\u00ed lo verificaron las autoridades de la provincia de Cotopaxi y de la Corporaci\u00f3n El\u00e9ctrica del Ecuador \u2013 CELEC EP, este viernes 15 de noviembre de 2024, durante un recorrido por el sitio [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":9081,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-9080","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/9080","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/comments?post=9080"}],"version-history":[{"count":4,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/9080\/revisions"}],"predecessor-version":[{"id":9549,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/9080\/revisions\/9549"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/media\/9081"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/media?parent=9080"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/categories?post=9080"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/tags?post=9080"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}