{"id":9501,"date":"2025-02-25T16:57:47","date_gmt":"2025-02-25T21:57:47","guid":{"rendered":"https:\/\/www.celec.gob.ec\/transelectric\/?p=9501"},"modified":"2025-02-26T16:59:42","modified_gmt":"2025-02-26T21:59:42","slug":"gestion-del-gobierno-nacional-permite-exportaciones-de-energia-a-peru-con-la-habilitacion-de-la-linea-machala-zorritos-a-230-mil-voltios","status":"publish","type":"post","link":"https:\/\/www.celec.gob.ec\/transelectric\/uncategorized\/gestion-del-gobierno-nacional-permite-exportaciones-de-energia-a-peru-con-la-habilitacion-de-la-linea-machala-zorritos-a-230-mil-voltios\/","title":{"rendered":"Gesti\u00f3n del Gobierno Nacional permite exportaciones de energ\u00eda a Per\u00fa, con la habilitaci\u00f3n de la l\u00ednea Machala \u2013 Zorritos a 230 mil voltios"},"content":{"rendered":"\n<p>Ecuador export\u00f3 energ\u00eda el\u00e9ctrica al Per\u00fa, a trav\u00e9s de la l\u00ednea de transmisi\u00f3n Machala \u2013 Zorritos a 230 mil voltios. Debido a un requerimiento del sistema el\u00e9ctrico peruano, el Centro de Operaci\u00f3n \u2013 COES \u2013 de ese pa\u00eds solicit\u00f3 al Operador Nacional de Electricidad \u2013 CENACE- el suministro de energ\u00eda el\u00e9ctrica hacia el pa\u00eds vecino, para los d\u00edas 24 y 25 de febrero.<\/p>\n\n\n\n<p>La Corporaci\u00f3n El\u00e9ctrica del Ecuador -CELEC EP-, a trav\u00e9s de su Unidad de Negocio TRANSELECTRIC, responsable de la operaci\u00f3n de esta l\u00ednea de transmisi\u00f3n gestion\u00f3, coordin\u00f3 y ejecut\u00f3 las acciones necesarias para habilitar la entrega de energ\u00eda desde sus instalaciones.<\/p>\n\n\n\n<p>CELEC EP \u2013 TRANSELECTRIC despleg\u00f3 un contingente t\u00e9cnico y log\u00edstico para realizar estos trabajos en tiempos m\u00ednimos, con el objetivo de conectar la l\u00ednea de transmisi\u00f3n Machala \u2013 Zorritos a 230 mil voltios, con lo que se viabiliz\u00f3 la interconexi\u00f3n el\u00e9ctrica con el Per\u00fa y la transmisi\u00f3n de electricidad. Desde las 12:50 del 24 de febrero, la l\u00ednea de transmisi\u00f3n se encuentra operando con normalidad y abastece de energ\u00eda a la zona norte del pa\u00eds vecino.<\/p>\n\n\n\n<p>Estas acciones evidencian que el Ecuador dispone de los recursos necesarios para abastecer la energ\u00eda requerida a los ecuatorianos y exportar los excedentes a los pa\u00edses cercanos. La Corporaci\u00f3n El\u00e9ctrica del Ecuador reafirma su compromiso con la entrega de un servicio el\u00e9ctrico confiable y continuo para el bienestar de todos sus ciudadanos.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"400\" src=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2025\/02\/ECUPERU25_02_25.png\" alt=\"\" class=\"wp-image-9502\" srcset=\"https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2025\/02\/ECUPERU25_02_25.png 600w, https:\/\/www.celec.gob.ec\/transelectric\/wp-content\/uploads\/2025\/02\/ECUPERU25_02_25-300x200.png 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Ecuador export\u00f3 energ\u00eda el\u00e9ctrica al Per\u00fa, a trav\u00e9s de la l\u00ednea de transmisi\u00f3n Machala \u2013 Zorritos a 230 mil voltios. Debido a un requerimiento del sistema el\u00e9ctrico peruano, el Centro de Operaci\u00f3n \u2013 COES \u2013 de ese pa\u00eds solicit\u00f3 al Operador Nacional de Electricidad \u2013 CENACE- el suministro de energ\u00eda el\u00e9ctrica hacia el pa\u00eds vecino, [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":9502,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-9501","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/9501","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/comments?post=9501"}],"version-history":[{"count":1,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/9501\/revisions"}],"predecessor-version":[{"id":9503,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/posts\/9501\/revisions\/9503"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/media\/9502"}],"wp:attachment":[{"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/media?parent=9501"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/categories?post=9501"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.celec.gob.ec\/transelectric\/wp-json\/wp\/v2\/tags?post=9501"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}